Establishment of a single-party framework for an integrated design team service for roof remedial works, including investigation and survey of existing roof structure, removal of asbestos slates, roof replacement, downpipe and gutter replacement to buildings at GMIT Mayo Campus, Westport Road, Castlebar, Co Mayo. It is intended that the initial contract at GMIT Mayo Campus, Westport Road, Castlebar, Co Mayo forms part of this Multi-party Framework Agreement. Subsequent call-off contracts for the other GMIT Third Level Educational Facilities may also form part of this framework. The duration of this framework is 4 years but for avoidance of doubt Call-off contracts may extend beyond the life of the framework.
Services
05/11/2015 12:00:00
71000000-8 Architectural, construction, engineering and inspection services
71200000-0 Architectural and related services
71300000-1 Engineering services
71311000-1 Civil engineering consultancy services
71312000-8 Structural engineering consultancy services
71317000-3 Hazard protection and control consultancy services
71318000-0 Advisory and consultative engineering services
71321000-4 Engineering design services for mechanical and electrical installations for buildings
71324000-5 Quantity surveying services
ATU Galway Mayo Formerly GMIT
Dublin Road
00000
Galway
Ireland
View profile
Corinna Gavin
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 02/10/2015 17:55 |
| Contract notice (TED (v208)) | 02/10/2015 17:40 |
| Contract Award Notice (eTenders) | 22/03/2017 14:40 |
| Contract award notice (TED (v209)) | 21/03/2017 16:10 |