The Contracting Authority intends to develop a new dedicated in-patient Cystic Fibrosis Unit, which will further the objectives of the National Clinical Care Programme for Cystic Fibrosis (NCPCF). The Contracting Authority will construct a three-storey block extension to its current premises with plant accommodation at the lower ground level, high dependency bedroom accommodation at upper ground and first floor levels and a link connection to the main hospital building. The Contracting Authority therefore wishes to appoint a suitably-qualified and experienced multi-disciplinary design team who will undertake the design of the facility from Stage (i) (Preliminary) through to Stage (v) (Handover), to include the appointment and management of a qualified contractor. The Contracting Authority will appoint an architect-led, multi-disciplinary design team.
Services
10/06/2019 12:00:00
71220000-6 Architectural design services
45215140-0 Hospital facilities construction work
45351000-2 Mechanical engineering installation works
71200000-0 Architectural and related services
71221000-3 Architectural services for buildings
71223000-7 Architectural services for building extensions
71311000-1 Civil engineering consultancy services
71322000-1 Engineering design services for the construction of civil engineering works
71324000-5 Quantity surveying services
Beaumont Hospital
Beaumont Road
Beaumont
Dublin
Ireland
View profile
Greg O'Leary
http://www.beaumont.ie
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 09/05/2019 15:10 |