The work requires alteration of the existing pews from the south transept to form a new suite of furniture to host interactive displays as part of the education programme. The existing pews are to be adapted and converted into bespoke high quality joinery. The work also requires alteration to the existing pews in the nave and adaptation of power and lighting services. We anticipate the majority of work will be carried out away from the Cathedral within suitable joinery workshops.
Works
31/01/2015 18:00:00
45000000-7 Construction work
45300000-0 Building installation work
45310000-3 Electrical installation work
45311000-0 Electrical wiring and fitting work
45311100-1 Electrical wiring work
45311200-2 Electrical fitting work
45400000-1 Building completion work
45420000-7 Joinery and carpentry installation work
45421000-4 Joinery work
45422000-1 Carpentry installation work
45422100-2 Woodwork
Saint Patrick’s Cathedral
Saint Patrick’s Close
Co.Dublin
Dublin 8
Ireland
View profile
Jo Blackburn
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 22/12/2014 18:10 |
| Contract notice (TED (v208)) | 22/12/2014 18:01 |
| Contract Award Notice (eTenders) | 12/10/2015 19:10 |
| Contract award notice (TED (v208)) | 12/10/2015 18:40 |
For full details please contact b2 Architects; e-mail: rob@b2architects.com tel.no. 0044 1934 713313