The Contracting Entity intends to procure a contract for the Supply, Maintenance, and Support of Hydro Control Centre (HCC) SCADA Upgrade. It is proposed that the Contract will include (non-exhaustive list – high level scope): Design, acquire the hardware, develop the software, assemble and work test, supply and deliver to the sites, erect, test at the sites, commission and optimise the HMI for the HCC SCADA system. It is not intended to replace the existing PLC’s and hardware which directly interface to the plant. The SCADA system shall interface with the PLCs and hardware in such a manner that full operation and monitoring facilities are available. It must also integrate with the ESB Enterprise Network. The HCC controls, operates and monitors 10 geographically separate sites controlling 20 hydro generating units and associated water controls. Local control is required for maintenance purposes, test purposes and for operating the plant under normal/fault conditions. The system shall be supported over its lifetime.
Services
08/02/2021 12:00:00
42961200-2 Scada or equivalent system
Electricity Supply Board ( ESB )
27 Fitzwilliam Street Lower
Dublin
Dublin
Ireland
View profile
Conor Molloy
http://www.esb.ie
Notice | Date of dispatch |
---|---|
Contract notice - utilities (TED (v209)) | 18/12/2020 09:11 |
![]() |
01/04/2021 12:26 |
Contract award notice - utilities (TED (v209)) | 23/02/2022 17:40 |
Please refer to the individual instructions for submission of bids relevant to each tender issued via the system.