Contract for the construction of facility upgrades/modifications at GNI UK Beattock Compressor Station in Scotland. The scope will include the construction, installation, commissioning and certification of the new temporary bypass tie-ins, splitting of suction and discharge headers, suction throttling facility and AGI DCS control system integration. The works will require interfaces with existing site infrastructure and equipment such as the suction and discharge headers, existing pipework, compressor buildings, site electrical system, SCADA, ducting, drainage and existing civil layout. The works will require liaison throughout the project duration with various stakeholders, particularly the Clients Operations Team and Engineers. The construction stage will include: 1 Pre-construction works including site-investigations and surveys, HAZCON, preparation of all HSQE documentation and programming and sequencing to ensure station operation is maintained 2 Installation of a temporary supply to maintain station operations during works 3 Installation of pipe arrangement to split suction and discharge headers. 4 Installation of suction throttling arrangement 5 Liaise and assist C&I contractor for SCS integration 6 Testing, Snagging, Commissioning and Site Acceptance Tests Handover to Client with complete H&S File including all records, residual risk register, full life cycle O&M schedule and manuals For further information please refer to PQQ document.
Works
21/02/2020 12:00:00
45231220-3 Construction work for gas pipelines
39340000-7 Gas network equipment
39341000-4 Gas pressure equipment
42112300-0 Gas turbines
42123100-8 Gas compressors
44161100-7 Gas pipelines
45255000-9 Construction work for the oil and gas industry
45255300-2 Gas terminal construction work
45255400-3 Fabrication work
Gas Networks Ireland
Gasworks Road
Cork
Cork
Ireland
View profile
Kelly Sexton
http://www.gasnetworks.ie
| Notice | Date of dispatch |
|---|---|
| Contract notice - utilities (TED (v209)) | 20/08/2019 17:10 |
| Contract award notice - utilities (TED (v209)) | 28/09/2021 17:10 |
Beattock Compressor Station Upgrades
You must submit through the etenders system before the deadline. The submission deadline is strict & no submissions will be possible after the date & time specified in the PQQ documents. Please note that all tenders are electronic, as such NO paper copies will be accepted or read. Please submit via the etenders system not later than 12:00 hrs local time Monday 23rd September 2019