The purpose of this tender is to identify the Most Economically Advantageous Tender for supply of Electricity and Natural Gas to the daa. In doing this we have set out in the attached documents/spreadsheets the requirements of the daa at the respective Cork & Dublin Airport sites. Separate contracts may be entered into for the supply of Electricity and for the supply of Natural Gas. A contract for a minimum 24 months will be awarded based on the submissions from this tender. A mini tender may be undertaken for a further 12-month term to ensure market competition. The three CHP engines at Dublin Airport have a combined output of 6.7MW (e). The CHP operating strategy is determined by the amount of potential savings generated. Savings are calculated based on the relative difference between natural gas and electricity and by the ability to use the heat generated. The heat is used for space heating and some domestic hot water in the Terminals, for which we would have a very low demand in summer months.
Supplies
30/01/2018 12:00:00
09310000-5 Electricity
09121200-5 Mains gas
09123000-7 Natural gas
31682000-0 Electricity supplies
daa plc
Dublin Airport
Co Dublin
Dublin
Ireland
View profile
Jane Hughes
http://www.daa.ie
| Notice | Date of dispatch |
|---|---|
| Contract notice - utilities (TED (v209)) | 20/12/2017 09:10 |