II.1)
Scope of the procurement
Provision of Electricity and or Gas to daa at Dublin and Cork Airports
Reference number:
Electricity and Gas Tender
Supplies
II.1.4)
Short description
The purpose of this tender is to identify the Most Economically Advantageous Tender for supply of Electricity and Natural Gas to the daa. In doing this we have set out in the attached documents/spreadsheets the requirements of the daa at the respective Cork & Dublin Airport sites.
Separate contracts may be entered into for the supply of Electricity and for the supply of Natural Gas. A contract for a minimum 24 months will be awarded based on the submissions from this tender. A mini tender may be undertaken for a further 12-month term to ensure market competition.
II.1.5)
Estimated total value
Value excluding VAT: 24000000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
09121200
-
Mains gas
09123000
-
Natural gas
31682000
-
Electricity supplies
II.2.3)
Place of performance
Main site or place of performance:
Dublin Airport
II.2.4)
Description of the procurement
The purpose of this tender is to identify the Most Economically Advantageous Tender for supply of Electricity and Natural Gas to the daa. In doing this we have set out in the attached documents/spreadsheets the requirements of the daa at the respective Cork & Dublin Airport sites.
Separate contracts may be entered into for the supply of Electricity and for the supply of Natural Gas. A contract for a minimum 24 months will be awarded based on the submissions from this tender. A mini tender may be undertaken for a further 12-month term to ensure market competition.
The three CHP engines at Dublin Airport have a combined output of 6.7MW (e). The CHP operating strategy is determined by the amount of potential savings generated. Savings are calculated based on the relative difference between natural gas and electricity and by the ability to use the heat generated. The heat is used for space heating and some domestic hot water in the Terminals, for which we would have a very low demand in summer months.
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 24000000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
36
This contract is subject to renewal:
yes
Description of renewals:
Renewal will be 36 months from award date.
II.2.9)
Information about the limits on the number of candidates to be invited
Envisaged minimum number:
4
/
Maximum number:
7
Objective criteria for choosing the limited number of candidates:
Please note that only those companies registered with the Commission for Energy Regulation, PO Box 11934, Dublin 24, Ireland, and in possession of a valid license to supply Gas and or Electricity in Ireland as of the 19 December 2017, will be permitted to participate in the upcoming tender for DAA Electricity and Gas Requirements 2019 - 2021.
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no