This Framework is for the design, manufacture, delivery and installation of Boiler components on the three 305MWe, Foster Wheeler natural circulation single furnace coal-fired boilers at Moneypoint Generating Station - works for each unit are likely to be tendered individually. This work will include boiler reheater pressure part replacement including tubing with all attachments and fittings. Refurbishment work on the three units will take place during outages in 2018, 2019 and 2020. Outage dates may change due to unforeseen circumstances. ESB Moneypoint Generating Station is located in the Shannon estuary in the south west of Ireland, near Kilrush in Co Clare. The site is located on the north bank of the River Shannon, 5 km east of Kilrush. Access is available to the site by road or by sea. The port of Dublin is 265 km distant, the port of Cork is 210 km distant and the port of Limerick is 85 km distant.
Services
06/09/2017 14:00:00
42162000-2 Steam-generating boilers
45351000-2 Mechanical engineering installation works
Electricity Supply Board ( ESB )
27 Fitzwilliam Street Lower
Dublin
Dublin
Ireland
View profile
Martha Maher
http://www.esb.ie
| Notice | Date of dispatch |
|---|---|
| Contract notice - utilities (TED (v209)) | 16/05/2017 13:10 |
| Contract award notice - utilities (TED (v209)) | 30/11/2017 15:40 |