ENQEIR803 - Requirement for Temporary Emergency Generation - 450MW

The RFT has ended, you cannot answer the invitation.

The CRU, with the consent of the Minister for the Environment, Climate and Communications, has directed EirGrid under Regulation 28(10) of the Regulations, in our capacity as the transmission system operator, to secure the delivery of c. 450MW of emergency temporary generation. As part of that direction, EirGrid, through a wholly owned special purpose vehicle was to procure from the market electricity generation plant. Given the extreme urgency of this process, EirGrid utilised the negotiated procedure without prior call for competition procedure, pursuant to Article 49 of the Regulations (SI No. 286 of 2016) and in so doing, identified GE as the preferred OEM. EirGrid negotiated and concluded the Contract and obtained relevant approvals for the SPV to contract with GE.

Supplies

21/12/2022 00:00:00

31122000-7  Generator units
31000000-6  Electrical machinery, apparatus, equipment and consumables; lighting
31100000-7  Electric motors, generators and transformers
31120000-3  Generators
31127000-2  Emergency generator


EirGrid plc
Block 2 - The Oval, 160 Shelbourne Road
Dublin 4
Ballsbridge
Ireland
View profile

Glen Brownlie
http://www.eirgrid.com

Published notices
Contract award notice - utilities (TED (v209)) 23/12/2022 09:40
Lots
Requirement for Temporary Emergency Generation Plant - circa 260MW at Shannonbridge
Additional information:
Documents Documents
Requirement for Temporary Emergency Generation Plant - circa 150MW at Tarbert
Additional information:
Documents Documents
Requirement for Temporary Emergency Generation Plant - Balance of Plant Related to Shannonbridge
Additional information:
Documents Documents
Requirement for Temporary Emergency Generation Plant - Balance of Plant Related to Tarbert
Additional information:
Documents Documents