Contract notice

Information

Published

Date of dispatch of this notice: 13/01/2023

Expire date: 14/02/2023

External Reference: 2023-266490

TED Reference: 2023/S 013-033565

Contract notice

[NoticeContract]

[Directive201424]

[Section1]: [Ca]

I.1)

[NameAddressContact]

Louth and Meath Education & Training Board
N/A
Abbey Road
Co Meath
Navan
IE
[Contactpoint]: Veronica Feeney
[AddressEmail]: vfeeney@lmetb.ie
[Nutscode]:  IE -  IRELAND
[Internets]:
[UrlGeneral]: https://www.lmetb.ie

I.2)

[JointProcurement]

[JointProcurementCentral]
I.3)

[InfoTendering]

[AddressObtainDocs]:  
http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=232106&B=ETENDERS_SIMPLE
[AddressFurtherinfo]
[AsContactsAbove]:  
[AddressSendTendersRequest]
[AddressSendTendersRequest]
[AddressToAbove]
I.4)

[CaType]

[MaintypeLocalauth]
I.5)

[Mainactivity]

[MainactivEducation]

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

22-007 – ITT for Main Contractor
[Fileref]:  22-007 O'Carolan College
II.1.2)

[CpvMain]

45214220  - 
II.1.3)

[TypeContract]

[Works]
II.1.4)

[DescrShort]

The demolition of the existing School Building and associated siteworks, removal of existing prefabricated buildings, demolition of a single storey former Metal works building located to the South East of the Ceard Scoil (a building listed in the record of protected structures). The construction of a three-storey school building consisting of 20 classrooms, 5 specialist rooms, 4 science laboratories, 2 arts and crafts rooms, home economic room, 3 construction engineering rooms, library, GP hall, MP hall, special needs units, admin offices, pastoral rooms, toilets etc. and other ancillary spaces. All ancillary siteworks comprising the constuction of a 52 bay carpark, car/ bus set down area, 4No. ballcourts, football pitch, site boundary treatments and re-configuration work to the adjoining R162 Navan to Kingscourt Road to facilitate safe access and egress.
II.1.5)

[ValueMagnitudeEstimatedTotal]

[ValueExclVat]: 17000000.00  EUR
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

45000000  - 
45210000  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  IE -  IRELAND
[MainsiteplaceWorksDelivery]:  
Nobber, Co Meath, Ireland
II.2.4)

[DescrProcurement]

The demolition of the existing School Building and associated siteworks, removal of existing prefabricated buildings, demolition of a single storey former Metal works building located to the South East of the Ceard Scoil (a building listed in the record of protected structures). The construction of a three-storey school building consisting of 20 classrooms, 5 specialist rooms, 4 science laboratories, 2 arts and crafts rooms, home economic room, 3 construction engineering rooms, library, GP hall, MP hall, special needs units, admin offices, pastoral rooms, toilets etc. and other ancillary spaces. All ancillary siteworks comprising the constuction of a 52 bay carpark, car/ bus set down area, 4No. ballcourts, football pitch, site boundary treatments and re-configuration work to the adjoining R162 Navan to Kingscourt Road to facilitate safe access and egress.
II.2.5)

[AwardCriteria]

[AwardCriteriaDescriptive]
II.2.6)

[ValueMagnitudeEstimated]

[ValueExclVat]: 17000000.00  EUR
II.2.7)

[DurationContractFrameworkDps]

[DurationMonths]: 28
[RenewalsSubject]: [No]
II.2.10)

[VariantsInfo]

[VariantsAccepted]: [No]
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]

[Section3]: [InfoLegal]

III.1)

[ConditionsParticip]

III.1.2)

[EconomicFinancialStanding]

[CriteriaSelectionDocs]
III.1.3)

[TechnicalCapacity]

[CriteriaSelectionDocs]
III.2)

[ConditionsContract]

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeOpen]
IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

IV.2.2)

[LimitReceiptTendersReqPart]

[Date]:  14/02/2023
[Time]:  12:00
IV.2.4)

[LanguagesAllowed]

[Language_EN]
IV.2.6)

[MinTimeMaintain]

[DurationMonths] : 9  ([FromStatedDate])
IV.2.7)

[OpeningConditions]

[Date]:  14/02/2023
[Time]:  12:00

[Section6]: [InfoComplement]

VI.1)

[RecurrenceInfo]

[RecurrentProcurement]:  [No]
VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

Department of Education
Tullamore
Tullamore
IE