[MainsiteplaceWorksDelivery]:
Colaiste Cholmcille, Inverin, Co. Galway
Mechanical installations for the construction of a new post-primary school Extension & Refurbishment of existing school building at Colaiste Cholmcille Inverin , Co Galway The proposed development works on a 1.76 ha/ 4.35 acres will consist of:
(i) School Building Extension (4,368m²) over 3 levels. Incorporating Classrooms, Specialist Teaching spaces, Social spaces, Multi-Purpose Hall, Special Education Needs Unit, Reception, Offices and Ancillary accommodation. Services to include Roof mounted photovoltaic panels, Boiler, ESB Substation Kiosk and Gas compound.
(ii) The Refurbishments to existing school building c1955, c1990 & c2013 (1184m2).
(iii) The demolition of two ancillary buildings (c1950s) and the existing prefab accommodation on the site.
(iv) New site entrances & internal access roadway with set down area, car parking for 45no. spaces (including 1no. EV Charging Point), 2no. covered bicycle stands, 1no. ballcourt, site lighting, new waste water treatment system and percolation area, landscaping, new site boundary treatments and all ancillary site works at Colaiste Cholmcille, Inverin, Co. Galway.
A complete Mechanical installation will be provided to school to include but not limited the following: External natural gas site services, External Rainwater harvesting system, above ground drainage systems, Hot, cold and rainwater services, Low pressure hot water heating installation, mechanical ventilation systems, full automatic building management control systems, internal gas pipework services, and firefighting protection services. The school building is designed to achieve a minimum A3 BER and designed to meet Part L regulations.
[EnvisagedNumber]:
8
[CriteriaChoosingLimited]:
as Suitability Assessment Questionnaire
A separate competition will be conducted by the Contracting Authority and identify the Electrical Reserved Specialists - these reserved specialists will be named in the Form of Tender and Schedule Part 3B for appointment by the main contractor upon the award of the main contract.