Newtown School Waterford - Post Primary School Redevelopment -Mechanical Installation
[Fileref]:
16015 Mech
[Works]
Mechanical reserved specialists’ role shall consist of the installation, testing and commissioning of all mechanical installations including sub-specialists works associated with the works.
Extension to the existing historic Newtown School campus involving demolition of 5 no. existing classroom blocks and construction of a new three storey Classroom Block extension including passenger lift and Special Educational Needs Block (5,339m2), new single storey PE Facility building (1,149m2), new vehicular entrance, car parking, boundary wall realignment, new substation and construction store, together with associated landscaping and external works. All within the curtilage of two Protected Structures.
Reserved specialists shall be pre-selected for Mechanical Installations, directly and separately tendered by the Contracting Authority for appointment by the main contractor upon award of the main contract.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 15500000.00
EUR
[DivisionLots]:
[No]
II.2.3)
[PlacePerformance]
[Nutscode]:
IE05 -
Southern
[MainsiteplaceWorksDelivery]:
Newtown School, Co. Waterford
II.2.4)
[DescrProcurement]
Mechanical reserved specialists’ role shall consist of the installation, testing and commissioning of all mechanical installations including sub-specialists works associated with the works.
Extension to the existing historic Newtown School campus involving demolition of 5 no. existing classroom blocks and construction of a new three storey Classroom Block extension including passenger lift and Special Educational Needs Block (5,339m2), new single storey PE Facility building (1,149m2), new vehicular entrance, car parking, boundary wall realignment, new substation and construction store, together with associated landscaping and external works. All within the curtilage of two Protected Structures.
Reserved specialists shall be pre-selected for Mechanical Installations, directly and separately tendered by the Contracting Authority for appointment by the main contractor upon award of the main contract.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 15500000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
33
[RenewalsSubject]:
[No]
[EnvisagedNumber]:
8
[CriteriaChoosingLimited]:
Suitability Assessment Questionnaire
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
Reserved Specialists are being pre-selected and procured separately from the Main Contract and when procured will enter into contract with the Main Contractor. Reserved Specialists will be required to execute a Collateral Warranty with the Employer.