Contract award notice

Information

Published

Date of dispatch of this notice: 16/09/2022

External Reference: 2022-267973

TED Reference: 2022/S 182-515943

Contract award notice

[NoticeContractAward]

[NoticeContractAwardSub]

[Directive201424]

[Section1]: [Ca]

I.1)

[NameAddressContact]

Department of the Environment, Climate and Communications
NA
29-31 Adelaide Road
Dublin
Dublin 2
IE
[Contactpoint]: Paul Corcoran
[Nutscode]:  IE0 -  IRELAND
[Internets]:
I.4)

[CaType]

[MaintypeMinistry]
I.5)

[Mainactivity]

[MainactivEnvironment]

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

A study and report analysing the impacts of increased electricity interconnection on achievement of Ireland’s 2030 and post 2030 climate and energy objectives
[Fileref]:  052022
II.1.2)

[CpvMain]

73110000  - 
II.1.3)

[TypeContract]

[Services]
II.1.4)

[DescrShort]

To incentivise further future electricity interconnection with neighbouring countries/markets, the Programme for Government and Climate Action Plan commit DECC to updating Ireland’s existing interconnector policy. Action 110 of the Climate Action Plan 2021 further requires that this update must take place by Q4 2022.
DECC International and Offshore Energy division will update the interconnection policy via two principle workstreams: 1) Public Consultation; 2) Procuring an external energy consultancy to conduct a study into the impact of increased interconnection on achieving Ireland’s increased climate and energy ambition, which will form the evidence base for updating Government’s existing policy.
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.1.7)

[ValueTotal]

[ValueExclVat]:  144000.00  EUR
II.2)

[Description]

II.2.2)

[CpvAdditional]

79311400  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  IE0 -  IRELAND
[MainsiteplaceWorksDelivery]:  
Dublin
II.2.4)

[DescrProcurement]

To incentivise further future electricity interconnection with neighbouring countries/markets, the Programme for Government and Climate Action Plan commit DECC to updating Ireland’s existing interconnector policy. Action 110 of the Climate Action Plan 2021 further requires that this update must take place by Q4 2022.
DECC International and Offshore Energy division will update the interconnection policy via two principle workstreams: 1) Public Consultation; 2) Procuring an external energy consultancy to conduct a study into the impact of increased interconnection on achieving Ireland’s increased climate and energy ambition, which will form the evidence base for updating Government’s existing policy.
The scope of the proposed study includes an assessment of:
• The impact, including economic and climate rationale, for developing further interconnection beyond the proposed Celtic and Greenlink interconnectors, on achieving Ireland’s 2030 and post 2030 climate and energy objectives.
• The extent to which clear signalling by Government on delivery of future interconnection capacity would impact delivery of 80% renewable electricity, including 5 GW of ORE, by 2030, and the longer-term objective of achieving net zero by 2050.
• To include consideration of the impact of further interconnection on de-risking renewables development, system operation and security of supply, in the context of Ireland’s energy and climate objectives.
• The extent to which further interconnection can contribute to the decarbonisation of Irish power generation and electricity consumed in Ireland, by replacing domestic fossil fuel generation.
• The impact of further interconnection on total power system costs.
• Consideration of the optimal countries/markets for Ireland to interconnect with, and whether priority should be placed on developing further interconnection with Great Britain or the EU IEM.
II.2.5)

[AwardCriteria]

[AwardCriteriaBelow]
[AwardCriterionQuality]  -  [AwardCriterionName]:  Technical and Professional Ability  /  [Weighting]:  30%
[AwardCriterionQuality]  -  [AwardCriterionName]:  Quality and technical merit of the proposal including Service delivery methodology and understanding of the brief  /  [Weighting]:  30%
[AwardCriterionQuality]  -  [AwardCriterionName]:  Contract management  /  [Weighting]:  10%
[AwardLowestCost]  -  [AwardCriterionName]:  Cost  /  [Weighting]:  30%
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeOpen]
IV.1.8)

[GpaInfo]

[GpaCovered] : [No]
IV.2)

[InfoAdmin]

IV.2.1)

[PubPrevious]

[NumberOj]: 2022/S 103-289577

[Section5]: [AwardOfContract]

[ContractNumber]: 1

[TitleContract]: A study and report analysing the impacts of increased electricity interconnection on achievement of Ireland’s 2030 and post 2030 climate and energy objectives

[AwardConfirm]: [Yes]
V.2)

[AwardOfContract]

V.2.1)

[DateAward]

08/09/2022
V.2.2)

[AwardOffersInfo]

[OffersReceived]:  6
[AwardedGroup] :  [Yes]
V.2.3)

[AwardedToName]

DNV Netherlands
Arnhem
NL
[Nutscode]:  NL226 -  Arnhem/Nijmegen

[AwardedSme] : [No]
DNV Netherlands
Arnhrm
NL
[Nutscode]:  NL226 -  Arnhem/Nijmegen

[AwardedSme] : [No]
V.2.4)

[ValueContractInfo] ([ExclVat])

[ValueEstimTotalContract]:  150000.00  EUR
[ValueTotalFinal]:  140000.00  EUR

[Section6]: [InfoComplement]

VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

Department of Environment, Climate and Communications
29-31 Adelaide Road
Dublin
IE