II.1)
[QuantityScopeContract]
Multidisciplinary Consultancy Services for TUS Moylish to City Active Travel Scheme - Phases 5-7
[Fileref]:
TUS Moylish to City Phase 5-7
[Services]
The proposed development will maintain a carriageway and city inbound bus lane. The scheme will include segregated cycletrack and footpath, dedicated pedestrian and cycle crossing facilities (including junction signalized, toucan and zebra). The works will also provide an upgrade of the traffic signals at Hassett’s Cross to provide both a protected junction arrangement for cyclists & bus priority measures for public transport. There are also additional upgrade works to bus stops, side road junctions, new road surfacing, installation of LED public lighting & surface water drainage works.
Along Belfield Court and Belfield Gardens, cyclists will be required to share the carriageway with cars. To improve safety to cyclists, traffic calming measures are being proposed including junction raised tables and the provision of localized narrowing of the carriageway with a chicane arrangement along the longest stretch between junctions.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 300000.00
EUR
[DivisionLots]:
[No]
71240000
-
71320000
-
71420000
-
II.2.3)
[PlacePerformance]
[MainsiteplaceWorksDelivery]:
Limerick.
II.2.4)
[DescrProcurement]
The proposed development will maintain a 6.0m carriageway and 3.0m city inbound bus lane from Moylish Roundabout to Hassett’s Cross, 6.0m carriageway and on-street parking on Sexton Street North and on High Road. The scheme will include segregated cycletrack and footpath, dedicated pedestrian and cycle crossing facilities (including junction signalized, toucan and zebra). The works will also provide an upgrade of the traffic signals at Hassett’s Cross to provide both a protected junction arrangement for cyclists & bus priority measures for public transport. There are also additional upgrade works to bus stops, side road junctions, new road surfacing, installation of LED public lighting & surface water drainage works.
Along Belfield Court and Belfield Gardens, cyclists will be required to share the carriageway with cars. To improve safety to cyclists, traffic calming measures are being proposed including junction raised tables and the provision of localized narrowing of the carriageway with a chicane arrangement along the longest stretch between junctions.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 300000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
21
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
The tenderers submission via e-tenders should consist of the following documents:
European Single Procurement Document (ESPD)
Completed Pricing Document including the Form of Tender.
Quality Submission Document