Corrigendum

Information

Published

Date of dispatch of this notice: 14/09/2022

External Reference: 2022-240228

TED Reference: 2022/S 180-510756

Corrigendum

[NoticeCorrigendum]

[NoticeCorrigendumSub]

[Services]

[Directive201425]

[Section1]: [CaCe]

I.1)

[NameAddressContact]

Iarnród Eireann-Irish Rail
IE 4812851 O
Connolly Station,
Dublin
Dublin
IE
[Contactpoint]: Kasia Steyn
[AddressPhone]: +353 17030000
[AddressEmail]: Kasia.Steyn@irishrail.ie
[Nutscode]:  IE -  IRELAND
[Internets]:

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

TPS Safety Assurance and Human Factors PQQ
[Fileref]:  8037
II.1.2)

[CpvMain]

79417000  - 
II.1.3)

[TypeContract]

[Services]
II.1.4)

[DescrShort]

IÉ is undertaking a multi annual project to replace its existing train control/warning systems with a modern Train Protection System (TPS).The specific scope of this tender is for services relating to part of the Iarnród Éireann network between the Northern Irish Border and Greystones now referred to as the Drogheda to Greystones TPS Project or “D2G”. To deliver the D2G part of the national TPS rollout Iarnród Éireann requires the following services:
• Safety Assurance Services including a Safety Assurance Manager (SAM)
• Human Factors Services including a Human Factors Project Lead (HFPL) Iarnród Éireann may choose to proceed with both or only one of the two services required.

[Section6]: [InfoComplement]

VI.6)

[IcarOriginalRef]

[NumberOj]: 2022/S 127-362987

[Section7]: [Changes]

VII.1)

[IcarCorrectAdd]

VII.1.2)

[IcarTextCorrected]

[SectionNo]:  IV.2.2)
[IcarInstead]:  
[Date]:  21/07/2022
[Time]:  12:00
[IcarRead]:  
[Date]:  23/09/2022
[Time]:  12:00
VII.2)

[IcarOtherInfo]

The new deadline to submit PQQ is 12 noon Friday 23/09/2022. This is to increase the competition.