II.1)
[QuantityScopeContract]
Louth County Council Mount Avenue Link Road
[Fileref]:
032/22
[Works]
It is proposed to construct a new link road which will consist of widening
the northern part of the existing Mount Avenue Road and the
construction of approximately 700m of new road through a greenfield
site before joining the R178 again by means of an existing access road to
the Lis Na Dara Housing estate. The central / northern end of the existing
Mount Avenue road beside the ESb substation will become a cul-de-sac
after Ard Easmuinn Road as part of the works.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 8000000.00
EUR
[DivisionLots]:
[No]
45000000
-
45112000
-
45233120
-
45233121
-
45233140
-
45233222
-
II.2.3)
[PlacePerformance]
II.2.4)
[DescrProcurement]
It is proposed to construct a new link road which will consist of widening
the northern part of the existing Mount Avenue Road and the
construction of approximately 700m of new road through a greenfield
site before joining the R178 again by means of an existing access road to
the Lis Na Dara Housing estate. The central / northern end of the existing
Mount Avenue road beside the ESb substation will become a cul-de-sac
after Ard Easmuinn Road as part of the works.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 8000000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
18
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]