[MainsiteplaceWorksDelivery]:
Castlebar, Co. Mayo.
Construction of a new social housing development at Golf Course Road on the outskirts of Westport town, Co. Mayo. The site is adjacent to Westport Houses grounds to the north west of the site (within approx. 195 meters from Westport House Farmyard Buildings which are a Protected Structure). There is an existing housing development & industrial building to the north east of the site. Westport Utd Football grounds & a public playground are located to the south west of the site.
Development comprises construction of of 50 no. dwellings, all dwellings will be provided with private gardens & associated carparking. Associated site development works include access roads, footways, greenway, site boundaries, open space, drainage, landscaping, associated earthworks, public lighting, utilities & services connections, diversions of services & ancillary works including:
- Removal of existing fencing & planting to provide access to the site.
- Construction of 50no new dwelling units, constructed as terraced or semi-detached blocks comprising:
o 14 No. Semi Detached 2 Bed (4 person) two storey units
o 36 No. Terraced / Semi Detached 3 Bed (6 person) two storey units
- Construction of new development entrances & access roads & builder’s compound.
- Site clearance including removal of existing trees & shrubs.
- Site clearance & bulk excavation to reduce site levels generally.
- Removal of material excavated from site to a licenced landfill facility.
- Redistribution of material excavated from site.
- Construction of new sloping earthen embankments.
- A mixture of plastered block walls, timber palisade & chain link fences to boundaries of the site.
- Stonework boundary walls to the front of the houses
- A mixture of plastered block walls & timber palisade fences constructed between gardens
- Site development & surfacing work including roads, paths & pavings to tie into & continue on the existing public roads & paths
- Diversion of existing ESB lines
- New Electricity Substation
- New connection to public utilities for all units including Electricity, Telecoms, Water, Sewers, Storm drainage along with the provision of new street lighting and outlet ducts for future Electric Vehicle charging.