Summer Works Mechanical Boiler and Plumbing Replacement and Associated Works
Reference number:
19247P
II.1.2)
Main CPV code
71000000
-
Architectural, construction, engineering and inspection services
II.1.3)
Type of contract
Services
II.1.4)
Short description
Full replacement of heating and plumbing systems in both Redeemer Girls and Boys School as one system including conversion to natural gas and associated works. There are two schools on the campus joined by a GP hall. The building is single storey and fifty years old. The current heating system is oil fired from two boilers. The floor area of the two schools combined is 3848 square metres.
Section VI: Complementary information
VI.6)
Original notice reference
Notice number in the OJ S: 2022/S 030-076340
Section VII: Changes
VII.1)
Information to be changed or added
VII.1.2)
Text to be corrected in the original notice
VII.2)
Other additional information
The project is for the full replacement of the oil heating system with a gas system. The range of cost for the project is between €600,000 and €900,000.