Corrigendum

Information

Published

Date of dispatch of this notice: 14/03/2022

External Reference: 2022-218787

TED Reference: 2022/S 055-144753

Corrigendum

[NoticeCorrigendum]

[NoticeCorrigendumSub]

[Works]

[Directive201425]

[Section1]: [CaCe]

I.1)

[NameAddressContact]

Iarnród Eireann-Irish Rail
IE 4812851 O
Connolly Station,
Dublin
Dublin
IE
[Contactpoint]: David Behan
[AddressPhone]: +353 7031776
[Nutscode]:  IE -  IRELAND
[Internets]:

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Redevelopment of Ceannt Station, Galway
[Fileref]:  7730
II.1.2)

[CpvMain]

45213320  - 
II.1.3)

[TypeContract]

[Works]
II.1.4)

[DescrShort]

As the Station buildings are listed protected much of the work will involve careful conservation of the existing building fabric therefore particular experience in this area will be essential.
Works include, see PQQ document for further information
-The removal of the existing train hall roof and its replacement with a new single span steel and glass arched roof similar in profile to the original station roof.
- Replacement of existing aluminium windows and doors with period-correct timber sash windows and doors
- Installation of a dedicated Per-Way Access Road
Internal
- Construction of 5no new station platforms including track slab, buffer stops
- Formation of a new southern concourse incl. a new entrance

[Section6]: [InfoComplement]

VI.6)

[IcarOriginalRef]

[NumberOj]: 2022/S 035-091053

[Section7]: [Changes]

VII.1)

[IcarCorrectAdd]

VII.1.2)

[IcarTextCorrected]

[SectionNo]:  IV.2.2
[IcarTextCorrPlace]:  Date
[IcarInstead]:  
[Date]:  16/03/2022
[Time]:  12:00
[IcarRead]:  
[Date]:  22/03/2022
[Time]:  12:00