II.1)
[QuantityScopeContract]
Single Supplier Framework Agreement for the Provision of Supply and Delivery of Non Ferrous Materials (Lot 1) & Hot Rolled Ferrous Materials (Lot 2) for TU Dublin
[Fileref]:
NCTR2200
[Supplies]
TU Dublin wishes to establish a Multi Lot, single supplier framework for supply and delivery of ferrous and non - ferrous materials. Delivery of this steel must be to both our Bolton Street/ Linenhall loading bay.
This competition is divided into two lots.
• Lot 1 - Non-Ferrous Material
• Lot 2 – Hot Rolled Ferrous Materials
Suppliers may tender for one or both lots. Each lot will be evaluated separately against the award criteria outlined and a maximum of 1 supplier will be appointed to each lot.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 410000.00
EUR
[DivisionLots]:
[Yes]
[LotsSubmittedFor]
[LotsAll]
Non Ferrous Materials
[LotNumber]:
1
44317000
-
44400000
-
44420000
-
44450000
-
II.2.3)
[PlacePerformance]
II.2.4)
[DescrProcurement]
TU Dublin wishes to establish a Multi Lot, single supplier framework for supply and delivery of ferrous and non - ferrous materials. Delivery of this steel must be to both our Bolton Street/ Linenhall loading bay.
This competition is divided into two lots.
• Lot 1 - Non-Ferrous Material
• Lot 2 – Hot Rolled Ferrous Materials
Suppliers may tender for one or both lots. Each lot will be evaluated separately against the award criteria outlined and a maximum of 1 supplier will be appointed to each lot.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 170000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
12
[RenewalsSubject]:
[Yes]
[RenewalsDescr]:
The Contracting Authority reserves the right to extend the Term for a period or periods of up to 12 with a maximum of 3 such extension or extensions on the same terms and conditions, subject to the Contracting Authority’s obligations at law. The Term will not exceed four (4) years in aggregate.
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]
Hot Rolled Ferrous Materials
[LotNumber]:
2
44317000
-
44400000
-
44420000
-
44450000
-
II.2.3)
[PlacePerformance]
II.2.4)
[DescrProcurement]
TU Dublin wishes to establish a Multi Lot, single supplier framework for supply and delivery of ferrous and non - ferrous materials. Delivery of this steel must be to both our Bolton Street/ Linenhall loading bay.
This competition is divided into two lots.
• Lot 1 - Non-Ferrous Material
• Lot 2 – Hot Rolled Ferrous Materials
Suppliers may tender for one or both lots. Each lot will be evaluated separately against the award criteria outlined and a maximum of 1 supplier will be appointed to each lot.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 240000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
12
[RenewalsSubject]:
[Yes]
[RenewalsDescr]:
The Contracting Authority reserves the right to extend the Term for a period or periods of up to 12 with a maximum of 3 such extension or extensions on the same terms and conditions, subject to the Contracting Authority’s obligations at law. The Term will not exceed four (4) years in aggregate.
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]