II.1)
[QuantityScopeContract]
Design and Build of Proposed Social Housing Development consisting of 69 housing units and Community Facility on a site located off Balgaddy Road, Lucan, Co. Dublin
[Fileref]:
3107
[Works]
Design and Build of Proposed Social Housing Development consisting of 69 housing units and Community Facility on a site located off Balgaddy Road, situated between Foxborough Lawn and Tor an Rí Walk, Lucan, Co. Dublin
The competition comprises a Design and Build project with accelerated delivery. Tenderers will be provided with house layouts, mechanical & electrical layouts, information, and indicative drawing information, together with specification and standards sufficient to establish the quality and construction standard required. The design will primarily involve the development of the design for construction, as adapted to the system and construction method, and organisation utilized by the tendering contractor, and the performance of the contractor to an accelerated construction schedule.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 20000000.00
EUR
[DivisionLots]:
[No]
45210000
-
45211000
-
45211100
-
45211300
-
45211340
-
45212300
-
45214100
-
45215200
-
45215221
-
45215222
-
II.2.3)
[PlacePerformance]
[Nutscode]:
IE061 -
Dublin
[MainsiteplaceWorksDelivery]:
South Dublin County Council Administrative Area
II.2.4)
[DescrProcurement]
Design and Build of Proposed Social Housing Development consisting of 69 housing units and Community Facility on a site located off Balgaddy Road, situated between Foxborough Lawn and Tor an Rí Walk, Lucan, Co. Dublin
The competition comprises a Design and Build project with accelerated delivery. Tenderers will be provided with house layouts, mechanical & electrical layouts, information, and indicative drawing information, together with specification and standards sufficient to establish the quality and construction standard required. The design will primarily involve the development of the design for construction, as adapted to the system and construction method, and organisation utilized by the tendering contractor, and the performance of the contractor to an accelerated construction schedule.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 20000000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
18
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
Quotations must be submitted online via the electronic
postbox on www.etenders.gov.ie before 4pm on April 4th, 2022.