Contract award notice - utilities

Information

Published

Date of dispatch of this notice: 11/01/2022

External Reference: 2022-273060

TED Reference: 2022/S 010-022135

Contract award notice - utilities

[NoticeAwardUtilities]

[NoticeContractAwardSub]

[Supplies]

[Directive201425]

[Section1]: [Ce]

I.1)

[NameAddressContact]

Irish Rail
Irish Rail
Procurement, Engineering & New Works, Inchicore Railway Works,
Dublin 8
D08 K6Y3
IE
[Contactpoint]: James Rattigan
[Nutscode]:  IE -  IRELAND
[Internets]:
I.6)

[Mainactivity]

[MainactivRailway]

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Gantry Cranes for Portlaoise Depot - 2 Lots
[Fileref]:  7719
II.1.2)

[CpvMain]

42414210  - 
II.1.3)

[TypeContract]

[Supplies]
II.1.4)

[DescrShort]

Design, supply, delivery and commissioning of two new gantry cranes each with a lifting capacity 25 tonnes (lot 1).
Repair, refurbishment, and upgrade of two existing gantry cranes each with a lifting capacity 15 tonnes (lot 2).
II.1.6)

[LotsInfo]

[DivisionLots]: [Yes]
II.2)

[Description]

II.2.1)

[TitleContract]

Supply/Delivery x 2 New Cranes
[LotNumber]:  1
II.2.2)

[CpvAdditional]

42414200  - 
42414500  - 
50531400  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  IE -  IRELAND
[MainsiteplaceWorksDelivery]:  
Portlaoise, Co. Laois
II.2.4)

[DescrProcurement]

Design, supply, delivery and commissioning of two new gantry cranes which will require a lifting capacity of 25 tonnes each.
The cranes shall be located in an external works and must be designed to resist degradation in an open environment and to be safely secured during extreme weather events. The primary purpose of the cranes is to provide tandem lifting capability for the supply of new track panels and removal of redundant track panels from on-board works trains but they may also undertake independent lifting activities. The cranes shall integrate with existing infrastructure of guide tracks and power supply rails and shall be capable of being operated from the ground and on-board cabin.
The contract will also include for the necessary training in the operation and maintenance of the cranes and a remedy of defects period. The successful contractor will be required to participate and co-operate with IE’s safety validation process for safely introducing new equipment and upgrading existing equipment. It is IÉ’s preference to have all equipment successfully commissioned within 6 months of contract execution.
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]
II.2)

[Description]

II.2.1)

[TitleContract]

Repair, Refurb & Upgrade x 2 Existing Cranes
[LotNumber]:  2
II.2.2)

[CpvAdditional]

42414200  - 
42414500  - 
50531400  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  IE -  IRELAND
[MainsiteplaceWorksDelivery]:  
Portlaoise, Co. Laois
II.2.4)

[DescrProcurement]

Repair, refurbishment and upgrade of two existing gantry cranes which have a lifting capacity of 15 tonnes each.
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeNegotWCall]
IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

IV.2.1)

[PubPrevious]

[NumberOj]: 2021/S 074-189812

[Section5]: [AwardOfContract]

[ContractNumber]: 1

[TitleContract]: Supply/Delivery x 2 New Cranes

[AwardConfirm]: [No]
V.1)

[AwardNoawardInfo]

[AwardNoaward]
[AwardDiscontinued]

[Section5]: [AwardOfContract]

[ContractNumber]: 2

[TitleContract]: Repair, Refurb & Upgrade x 2 Existing Cranes

[AwardConfirm]: [No]
V.1)

[AwardNoawardInfo]

[AwardNoaward]
[AwardDiscontinued]

[Section6]: [InfoComplement]

VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

Central Office of the High Court
Four Courts
Dublin 7
D07 N972
IE
[AddressPhone]: +353 18886511
[AddressFax]: +353 18886125

VI.4.2)

[MediationBody]

High Court
Four Court
Dublin
IE

VI.4.4)

[AppealsInfo]

Central Office of the High Court
Four Courts
Dublin 7
D07 N972
IE
[AddressPhone]: +353 18886511
[AddressFax]: +353 18886125