II.1)
[QuantityScopeContract]
Expression of interest for an Innovative Partnership Process between FuturEnergy Ireland and Candidate Long Duration Energy Storage Technology Providers
[Services]
The purpose of this pre-qualification questionnaire is to identify suitably qualified technology providers developing long duration storage technologies with the potential to cost effectively solve grid congestion and system integration challenges on a power system with up to 80% renewables (primarily wind energy). The ultimate aim / ambition of this process is the deployment of at least 500MW of 12-100hr storage on the Irish power system by 2030.
Please find pre-qualification questionnaire attached with further details on requirements and the various steps within the process.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 1.00
EUR
[DivisionLots]:
[No]
II.2.3)
[PlacePerformance]
[MainsiteplaceWorksDelivery]:
Ireland
II.2.4)
[DescrProcurement]
The purpose of this pre-qualification questionnaire is to identify suitably qualified technology providers developing long duration storage technologies with the potential to cost effectively solve grid congestion and system integration challenges on a power system with up to 80% renewables (primarily wind energy). The ultimate aim / ambition of this process is the deployment of at least 500MW of 12-100hr storage on the Irish power system by 2030.
Please find pre-qualification questionnaire attached with further details on requirements and the various steps within the process.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 1.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
120
[RenewalsSubject]:
[No]
[EnvisagedNumber]:
5
[CriteriaChoosingLimited]:
The number cited above will depend on the quality of applications received
[VariantsAccepted]:
[Yes]
[Options]:
[No]
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
Please note the timeframe cited in section 11.2.7 is indicative only