Contract award notice - utilities

Information

Published

Date of dispatch of this notice: 11/11/2021

External Reference: 2021-288547

TED Reference: 2021/S 222-585668

Contract award notice - utilities

[NoticeAwardUtilities]

[NoticeContractAwardSub]

[Works]

[Directive201425]

[Section1]: [Ce]

I.1)

[NameAddressContact]

Iarnród Eireann-Irish Rail
IE 4812851 O
Connolly Station,
Dublin
Dublin
IE
[Contactpoint]: Noel Coss
[AddressPhone]: +353 17031775
[AddressEmail]: Noel.Coss@irishrail.ie
[Nutscode]:  IE -  IRELAND
[Internets]:
I.6)

[Mainactivity]

[MainactivRailway]

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Track Stabilisation (mini-piling) Lisduff
[Fileref]:  7765
II.1.2)

[CpvMain]

45234100  - 
II.1.3)

[TypeContract]

[Works]
II.1.4)

[DescrShort]

Iarnród Éireann (IÉ) has a requirement for a Civil/Structural Engineering contractor to carry out piling works along a section of track on the Dublin-Cork line. The location of the site is between 71mls 1735yds and 72mls 1560yds at Lisduff, Co. Tipperary This section of track is double line which serves passenger services between Dublin (Heuston Station) and Cork (Kent Station). The traffic along the section has a max speed of 90MPH.
The track bed has a soft peat formation which has resulted in problems with both vertical and horizontal track alignment. As a result of the poor track bed formation, a permanent 80mph speed restriction has been imposed on this stretch of 100mph line. Frequent tamping intervention is also required at this location to ensure that the track bed remains stable.
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

45220000  - 
45234100  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  IE -  IRELAND
II.2.4)

[DescrProcurement]

Iarnród Éireann (IÉ) has a requirement for a Civil/Structural Engineering contractor to carry out piling works along a section of track on the Dublin-Cork line. The location of the site is between 71mls 1735yds and 72mls 1560yds at Lisduff, Co. Tipperary This section of track is double line which serves passenger services between Dublin (Heuston Station) and Cork (Kent Station). The traffic along the section has a max speed of 90MPH.
The track bed has a soft peat formation which has resulted in problems with both vertical and horizontal track alignment. As a result of the poor track bed formation, a permanent 80mph speed restriction has been imposed on this stretch of 100mph line. Frequent tamping intervention is also required at this location to ensure that the track bed remains stable.
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeNegotWCall]
IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

IV.2.1)

[PubPrevious]

[NumberOj]: 2021/S 107-282776

[Section5]: [AwardOfContract]

[ContractNumber]: 1

[TitleContract]: Track Stabilisation (mini-piling) Lisduff

[AwardConfirm]: [Yes]
V.2)

[AwardOfContract]

V.2.1)

[DateAward]

16/09/2021

[Section6]: [InfoComplement]

VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

Central Office of the High Court
Four Courts
Dublin 7
D07 N972
IE
[AddressPhone]: +353 18886511
[AddressFax]: +353 18886125

VI.4.2)

[MediationBody]

High Court
Dublin
IE

VI.4.4)

[AppealsInfo]

Central Office of the High Court
Four Courts
Dublin 7
D07 N972
IE
[AddressPhone]: +353 18886511
[AddressFax]: +353 18886125