Toilet Upgrade & Associated Works
[Fileref]:
GLYNN N.S.
Removal /replacement of toilet & whb sanitary ware (Classrooms 1 – 6) + Staff
Toilet + 2no. outside Principal’s Office – as per specification in accompanying School Design Guide for SanitaryFacilities in Schools (ref. SDG 02-06)
· Provision of mechanical ventilation to all sanitary areas
· Alterations (repair/replacement) of doors – incl. replacement of 6 no..doors with
FD60S Fire Doors, addition of hold-open system to 3 no. double doors and
Replacement/Painting of 20 no. doors (all as shown on Drgs),
plus blocking up & making good of 2no. existing internal doorways.
· Walls/ceilings to be painted (where so indicted on Drgs)
· Reflooring (where so indicted on Drgs)
· Renovation of Staff Room (as shown on Drgs)
· New shelving x4 & Slide robes x2 as shown on Drgs), plus
· and all other associated works (as detailed in Pricing Document)
[LowestOffer]:
80680.00
EUR
/
[HighestOffer]:
80680.00
EUR
[TakenConsideration]
([ExclVat])