II.1)
[QuantityScopeContract]
South Galway (Gort lowlands) Flood Relief Scheme Contract No. 1 - Preliminary Site Investigation
[Fileref]:
190420
[Works]
Works required include: rotary cores, boreholes, trial pits, slit trenches, sampling, in-situ and laboratory testing, ground water monitoring. Also included: interpretation of data / investigation, reporting and preparation of drawings and presentations.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 240000.00
EUR
[DivisionLots]:
[No]
II.2.3)
[PlacePerformance]
[MainsiteplaceWorksDelivery]:
Gort / Kinvarra, Co. Galway , Ireland
II.2.4)
[DescrProcurement]
Works shall include rotary cores, boreholes, trial pits, slit trenches, sampling, in-situ and laboratory testing and ground water monitoring. The contract includes for data interpretation, report preparation and data presentation.
[AwardCriteriaBelow]
[Price]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 240000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
13
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[No]
II.2.12)
[ElectronicCatalogue]
[ElectronicCatalogueRequired]
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
The works period for the project is 14 weeks but ground water monitoring is to be performed over a 12 month period.