Contract notice

Information

Published

Date of dispatch of this notice: 17/05/2021

Expire date: 25/06/2021

External Reference: 2021-212827

TED Reference: 2021/S 098-252450

Contract notice

[NoticeContract]

[Directive201424]

[Section1]: [Ca]

I.1)

[NameAddressContact]

Mayo County Council
N/A
Aras an Chontae
Co. Mayo
Castlebar
IE
[Contactpoint]: Cuala McGann
[AddressPhone]: +353 0949064598
[AddressEmail]: cmcgann@mayococo.ie
[Nutscode]:  IE042 -  West
[Internets]:
[UrlGeneral]: https://www.mayo.ie

I.2)

[JointProcurement]

[JointProcurementCentral]
I.3)

[InfoTendering]

[AddressObtainDocs]:  
http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=188314&B=ETENDERS_SIMPLE
[AddressFurtherinfo]
[AsContactsAbove]:  
[AddressSendTendersRequest]
[AddressSendTendersRequest]
[AddressToAbove]
I.4)

[CaType]

[MaintypeLocalauth]
I.5)

[Mainactivity]

[MainactivGeneral]

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

50 UNIT HOUSING DEVELOPMENT AT REHIN’S FORT, BALLINA, CO. MAYO
[Fileref]:  A589 Housing - Ballina, Co. Mayo
II.1.2)

[CpvMain]

45211100  - 
II.1.3)

[TypeContract]

[Works]
II.1.4)

[DescrShort]

Construction of a new social housing development at Rehin’s Fort located on a site to the rear of the existing “Rehin’s Fort” housing estate, on the outskirts of the town of Ballina, Co. Mayo. The construction of 50 no. dwellings comprising 2, 3 & 4 bedroomed semi-detached houses (including 1 no. 4 bedroomed special needs dormer dwelling) along with services connections to existing Public Foul & Storm Sewer & Utilities, all associated site development works, landscaping, including all ancillary site works; the provision of new street lighting and outlet ducts for future Electric Vehicle charging.
• 50 no new dwelling units, constructed as semi-detached blocks:
o 8 No. Semi Detached 2 Bed (4 person) single storey units
o 22 No. Semi Detached 2 Bed (4 person) two storey units
o 15 No. Semi Detached 3 Bed (6 person) two storey units
o 4 No. Semi Detached 4 Bed (7 person) two storey units
o 1 No. Semi Detached 4 Bed (7 person) special needs two storey dormer unit
II.1.5)

[ValueMagnitudeEstimatedTotal]

[ValueExclVat]: 10132000.00  EUR
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

45210000  - 
45211100  - 
II.2.3)

[PlacePerformance]

[Nutscode]:  IE -  IRELAND
[MainsiteplaceWorksDelivery]:  
Rehin's Fort, Ballina, Co. Mayo
II.2.4)

[DescrProcurement]

New social housing construction at Rehin’s Fort located on a site to the rear of the existing Rehin’s Fort housing estate on the outskirts of Ballina. The access from the main N26 Rd is through this existing estate. The site is adjacent to a green buffer zone along the Moy River & there is a tributary to the north & an existing factory (Hollister) to the south of the site. Development comprises the construction of 50 no. dwellings & services connections to existing Public Foul, Storm Sewer & Utilities, all associated site development, landscaping & ancillary works:
• Provision of screen fencing to protect & enclose the site.
• 50 no new dwelling units, constructed as semi-detached blocks comprising:
o 8 No. Semi Detached 2 Bed (4 person) single storey units
o 22 No. Semi Detached 2 Bed (4 person) 2 storey units
o 15 No. Semi Detached 3 Bed (6 person) 2 storey units
o 4 No. Semi Detached 4 Bed (7 person) 2 storey units
o 1 No. Semi Detached 4 Bed (7 person) special needs 2 storey dormer unit
• Construction of temporary builder’s compound
• Maintain & protect existing access roadway through existing residential development throughout the works phase
• Construction of new access roadways
• Site clearance including removal of existing trees/shrubs
• Site clearance & bulk excavation to reduce site levels generally
• Removal of material excavated from site to a licenced landfill facility
• Redistribution of material excavated from site
• Re-grading of the site to suit final levels
• Construct a mixture of rendered block walls, timber palisade & chain link fences to site boundaries
• Construct Stonework boundary walls to screen rear private gardens from public roadways/paths
• Construct timber palisade walls between gardens
• Site development & surfacing works i.e. roads/paths/paving’s to tie into & continue on existing public roads & path
• New connections to public utilities for all units & new street lighting & outlet ducts for future Electric vehicle charging
II.2.5)

[AwardCriteria]

[AwardCriteriaDescriptive]
II.2.6)

[ValueMagnitudeEstimated]

[ValueExclVat]: 10132158.00  EUR
II.2.7)

[DurationContractFrameworkDps]

[DurationMonths]: 20
[RenewalsSubject]: [No]
II.2.10)

[VariantsInfo]

[VariantsAccepted]: [No]
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]

[Section3]: [InfoLegal]

III.1)

[ConditionsParticip]

III.1.1)

[SituationPersonalIncl]

[InfoEvaluatingRequir]:  Refer to suitability assessment questionnaire, supplements, appendices & declarations which are required to be completed in full, and submitted as part of the tender submission.
III.1.2)

[EconomicFinancialStanding]

[InfoEvaluatingWethRequir]:  
Refer to suitability assessment questionnaire, supplements, appendices & declarations which are required to be completed in full, and submitted as part of the tender submission.
[MinStandardsRequired]:  
Refer to suitability assessment questionnaire, supplements, appendices & declarations which are required to be completed in full, and submitted as part of the tender submission.
III.1.3)

[TechnicalCapacity]

[InfoEvaluatingWethRequir]:  
Refer to suitability assessment questionnaire, supplements, appendices & declarations which are required to be completed in full, and submitted as part of the tender submission.
[MinStandardsRequired]:  
Refer to suitability assessment questionnaire, supplements, appendices & declarations which are required to be completed in full, and submitted as part of the tender submission.
III.2)

[ConditionsContract]

III.2.2)

[OtherConditions]

As per contract documents.
III.2.3)

[StaffResponsible]

[StaffResponsibleIndicate]

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeOpen]
IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

IV.2.2)

[LimitReceiptTendersReqPart]

[Date]:  23/06/2021
[Time]:  16:00
IV.2.4)

[LanguagesAllowed]

[Language_EN]
IV.2.6)

[MinTimeMaintain]

[DurationMonths] : 6  ([FromStatedDate])
IV.2.7)

[OpeningConditions]

[Date]:  24/06/2021
[Time]:  09:00
[OpeningPlace]:  
Mayo County Council, Aras an Chontae, Castlebar, Co. Mayo, IRE
[OpeningAdditInfo]:  
Tender Opening Committee - minimum 3 persons authorised by Mayo County Council

[Section6]: [InfoComplement]

VI.1)

[RecurrenceInfo]

[RecurrentProcurement]:  [No]
VI.2)

[InfoEworkflow]

[EinvoicingUsed]
[EpaymentUsed]
VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

refer Section N : Tender & Schedule A
refer Section N : Tender & Schedule A
IE