Contract notice - utilities

Information

Published

Date of dispatch of this notice: 16/02/2021

Expire date: 29/03/2021

External Reference: 2021-261296

TED Reference: 2021/S 035-088305

Contract notice - utilities

[NoticeContractUtilities]

[Supplies]

[Directive201425]

[Section1]: [Ce]

I.1)

[NameAddressContact]

Shannon Airport Authority DAC
N/A
Shannon Airport, Shannon
Clare
Co.
IE
[Contactpoint]: Patricia Cassidy
[AddressPhone]: +353 872191758
[Internets]:
I.3)

[InfoTendering]

[AddressObtainDocs]:  
http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=183091&B=ETENDERS_SIMPLE
[AddressFurtherinfo]
[AsContactsAbove]:  
[AddressSendTendersRequest]
[AddressSendTendersRequest]
[AddressToAbove]
I.6)

[Mainactivity]

[MainactivAirportrelated]

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Supply of a Passenger Boarding Bridge Installation to Shannon Airport Authority DAC
II.1.2)

[CpvMain]

34969100  - 
II.1.3)

[TypeContract]

[Supplies]
II.1.4)

[DescrShort]

This project scope includes for design, manufacture with factory acceptance test (FAT), transport and installation of one 3 tunnel Passenger Boarding Bridge (hereafter referred to as a PBB) on site at the Pier Building in Shannon Airport. The new PBB supply will cover all major components including the rotunda support column, rotunda including the connection corridor to the Pier Building, tunnel sections, bridgehead, service stairs, vertical drive and wheel drive unit and all other equipment detailed in this specification. The PBB supplier will be responsible for all on-site works
II.1.5)

[ValueMagnitudeEstimatedTotal]

[ValueExclVat]: 600000.00  EUR
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

34960000  - 
34969000  - 
45213353  - 
II.2.4)

[DescrProcurement]

This project scope includes for design, manufacture with factory acceptance test (FAT), transport and installation of one 3 tunnel Passenger Boarding Bridge (hereafter referred to as a PBB) on site at the Pier Building in Shannon Airport. The new PBB supply will cover all major components including the rotunda support column, rotunda including the connection corridor to the Pier Building, tunnel sections, bridgehead, service stairs, vertical drive and wheel drive unit and all other equipment detailed in this specification. The PBB supplier will be responsible for all on-site works
II.2.5)

[AwardCriteria]

[AwardCriteriaDescriptive]
II.2.6)

[ValueMagnitudeEstimated]

[ValueExclVat]: 600000.00  EUR
II.2.7)

[DurationContractFrameworkDps]

[DurationMonths]: 9
[RenewalsSubject]: [No]
II.2.10)

[VariantsInfo]

[VariantsAccepted]: [No]
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]

[Section3]: [InfoLegal]

III.1)

[ConditionsParticip]

III.1.2)

[EconomicFinancialStanding]

[CriteriaSelectionDocs]
III.1.3)

[TechnicalCapacity]

[CriteriaSelectionDocs]
III.2)

[ConditionsContract]

III.2.3)

[StaffResponsible]

[StaffResponsibleIndicate]

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeOpen]
IV.1.8)

[GpaInfo]

[GpaCovered] : [No]
IV.2)

[InfoAdmin]

IV.2.2)

[LimitReceiptTendersReqPart]

[Date]:  24/03/2021
[Time]:  15:00
IV.2.4)

[LanguagesAllowed]

[Language_EN]
IV.2.6)

[MinTimeMaintain]

[DurationMonths] : 4  ([FromStatedDate])
IV.2.7)

[OpeningConditions]

[Date]:  24/03/2021
[Time]:  15:00

[Section6]: [InfoComplement]

VI.1)

[RecurrenceInfo]

[RecurrentProcurement]:  [No]
VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

Office of Government Procurement
Dublin
IE