II.1)
[QuantityScopeContract]
Supply of a Passenger Boarding Bridge Installation to Shannon Airport Authority DAC
[Supplies]
This project scope includes for design, manufacture with factory acceptance test (FAT), transport and installation of one 3 tunnel Passenger Boarding Bridge (hereafter referred to as a PBB) on site at the Pier Building in Shannon Airport. The new PBB supply will cover all major components including the rotunda support column, rotunda including the connection corridor to the Pier Building, tunnel sections, bridgehead, service stairs, vertical drive and wheel drive unit and all other equipment detailed in this specification. The PBB supplier will be responsible for all on-site works
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 600000.00
EUR
[DivisionLots]:
[No]
34960000
-
34969000
-
45213353
-
II.2.4)
[DescrProcurement]
This project scope includes for design, manufacture with factory acceptance test (FAT), transport and installation of one 3 tunnel Passenger Boarding Bridge (hereafter referred to as a PBB) on site at the Pier Building in Shannon Airport. The new PBB supply will cover all major components including the rotunda support column, rotunda including the connection corridor to the Pier Building, tunnel sections, bridgehead, service stairs, vertical drive and wheel drive unit and all other equipment detailed in this specification. The PBB supplier will be responsible for all on-site works
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 600000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
9
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]