II.1)
[QuantityScopeContract]
The Office of Public Works (OPW) intends establishing a multiparty Framework Contract for the purposes of delivering on design and construction of fit-out and refurbishment works in buildings.
[Fileref]:
Framework for Construction Works
[Works]
The Office of Public Works (OPW) intends establishing a multiparty Framework Contract for the purposes of delivering on design and construction of fit-out and refurbishment works in buildings. This tender competition is for Construction Works Contractors (With Design Team) for inclusion in framework. The tender requires contractors to demonstrate a minimum capacity and capability in general building, mechanical and electrical works, either as a single economic entity or as a team with the required specialists. The framework also requires the successful framework participants to have both architectural and mechanical and electrical engineering consultants as part of their team.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 40000000.00
EUR
[DivisionLots]:
[No]
45300000
-
45400000
-
71220000
-
71321000
-
II.2.4)
[DescrProcurement]
The Office of Public Works (OPW) intends establishing a multiparty Framework Contract for the purposes of delivering on design and construction of fit-out and refurbishment works in buildings. This tender competition is for Construction Works Contractors (With Design Team) for inclusion in framework. The tender requires contractors to demonstrate a minimum capacity and capability in general building, mechanical and electrical works, either as a single economic entity or as a team with the required specialists. The framework also requires the successful framework participants to have both architectural and mechanical and electrical engineering consultants as part of their team.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 40000000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
24
[RenewalsSubject]:
[Yes]
[RenewalsDescr]:
The Contracting Authority reserves the right to extend the Term for a period or periods of up to 12 to 24 months with a maximum of 48 months in total for the Framework Contract on the same terms and conditions, subject to the Contracting Authority’s obligations at law.
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]