II.1)
Scope of the procurement
Control Room of the Future
Reference number:
ENQEIR717
79410000
-
Business and management consultancy services
Services
II.1.4)
Short description
EirGrid is seeking expressions of interest from suitably qualified and competent advisors to review our current Control Room Operations in Dublin/Belfast and other jurisdictions in the energy and non-energy sectors from around the world to identify best practice in terms of tools, processes and systems. This is expected to include big data analytics promoting control and decision making in a dynamic environment to facilitate automation for our 2030 and beyond requirements taking the high level of planned renewable integration.
The successful tenderer will be required to:
- Develop a vison of the control room of 2030 and beyond,
- Identify activities and options which may facilitate best practice and operation,
- Develop a prototype or virtual reality experience of the proposal, and
- Develop an outline design and roadmap with proposed implementation programme
II.1.6)
Information about lots
This contract is divided into lots:
no
II.1.7)
Total value of the procurement
( Agree to publish? yes )
Value excluding VAT:
425150.00
EUR
II.2.2)
Additional CPV code(s)
64215000
-
IP telephone services
64220000
-
Telecommunication services except telephone and data transmission services
64226000
-
Telematics services
65000000
-
Public utilities
65310000
-
Electricity distribution
65320000
-
Operation of electrical installations
II.2.3)
Place of performance
Main site or place of performance:
Dublin and Belfast
II.2.4)
Description of the procurement
EirGrid Group operates and develops the electricity system in Ireland. Our 2020 - 25 strategy is shaped by climate change and the transition of the electricity sector to low-carbon, renewable energy. We have a unique role to play in leading the radical transformation that is required. Our strategy sums up our response to these challenges. It consists of a set of key goals, underpinned by our purpose to "Transform the power system for future generations". One of the Primary Company goals is to "Lead the island's electricity sector on sustainability and decarbonisation " renewable targets. The Climate Action Plan 2019 states that 70% of electricity will be generated from renewable sources by 2030. In the UK, the Government is pursuing net zero carbon emissions by 2050. We can currently operate the grid with up to 65% of renewable power. By 2030 this must increase to 95%.
To do this we must operate the system in a more dynamic and responsive way. Integral to this is to develop our Contol Room in accordance with international best practice utilising the most up to date technology, processes and systems
EirGrid is seeking expressions of interest from suitably qualified and competent advisors to review our current Control Room Operations in Dublin/Belfast and other jurisdictions in the energy and non-energy sectors from around the world to identify best practice in terms of tools, processes and systems. This is expected to include big data analytics promoting control and decision making in a dynamic environment to facilitate automation for our 2030 and beyond requirements taking the high level of planned renewable integration.
The successful tenderer will be required to:
- Develop a vison of the control room of 2030 and beyond,
- Identify activities and options which may facilitate best practice and operation,
- Develop a prototype or virtual reality experience of the proposal, and
- Develop an outline design and roadmap with proposed implementation programme
II.2.5)
Award criteria
( Agree to publish? yes )
Criteria below
Quality criterion
-
Name:
Quantity, Quality and Balance of Human Resources
/
Weighting:
30
Quality criterion
-
Name:
Approach and Methodology
/
Weighting:
35
Price
-
Weighting:
35
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no