Tender for Civil/Structural Engineering Service for Additional Accommodation Project at Gorey CS
[Fileref]:
Gorey Community School
Tender for Civil /structural Engineer to form part of the Design Team to design and deliver the extension to Gorey CS Consisting of the following :
5/ 58.6M2 General Classrooms ,4/ 15M2 SET rooms ,1/118.6M2 Art room ,1/ 118.6M2 Home Economics room ,1/88.6M2 Science room.1/38.5M2 Prep room ,7/3.5M2 student toilets
,1/ 10.5M2 Universal toilet ,2/3.5M2 staff toilets ,150 locker spaces
Total Floor area including Circulation Area ,Internal Partitions ,etc 1032M2
Gorey is a large 2 storey school with over 1600 pupils built in the 1990's
[ValueExclVat]:
54528.00
EUR