II.1)
[QuantityScopeContract]
Crescent Quay - Dredging works
[Fileref]:
43/SP/2020
[Services]
Wexford County Council (WCC) proposes to carry out dredging works in the vicinity of Crescent Quay Wexford. In addition, WCC requires the development of a dredging plan to maintain adequate depths of water, within Crescent Quay and the adjoining breakwater arm area of the harbour.
Both Crescent Quay and the breakwater arm area have become significantly silted since 2001, limiting their use for maritime activates and taking from the overall attractiveness of the area.
WCC is seeking consultancy services to design, obtain consent, tender and provide construction management services to dredge the Crescent and Breakwater basins and to put in place the required consents for a programme of routine maintenance dredging of this area.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 240000.00
EUR
[DivisionLots]:
[No]
71241000
-
71313000
-
71300000
-
II.2.3)
[PlacePerformance]
[MainsiteplaceWorksDelivery]:
South East
II.2.4)
[DescrProcurement]
Wexford County Council (WCC) proposes to carry out dredging works in the vicinity of Crescent Quay Wexford. In addition, WCC requires the development of a dredging plan to maintain adequate depths of water, within Crescent Quay and the adjoining breakwater arm area of the harbour.
Both Crescent Quay and the breakwater arm area have become significantly silted since 2001, limiting their use for maritime activates and taking from the overall attractiveness of the area.
WCC is seeking consultancy services to design, obtain consent, tender and provide construction management services to dredge the Crescent and Breakwater basins and to put in place the required consents for a programme of routine maintenance dredging of this area.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 240000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
27
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]