Bord Iascaigh Mhara Barge Refurbishment Works
[Fileref]:
Bord Iascaigh Mhara 2020
The services comprise of the refurbishment of the BIM Barge Sandfisher. This includes , but not limited to, towing the vessel from the port of Castletownbere to a suitable drydock, and returning to Castletownbere on completion of the works. Drydocking the vessel, the hull shot blasted and painted, new steel maindeck fitted, superstructure to be refurbished inside and out and painted. Railings to be fitted all around the maindeck. All electrics to be re furbished. New generator to be fitted. Full details in Specifications and Requirements (Appendix 1) of RFT document.
[ValueExclVat]:
273583.00
EUR