Waterford
Improvements to the 2.1 Km section of existing Greenway from the Bilberry Car Park to the Clock Tower at Waterford City Centre, works will comprise a combination of the following:
1. 1.6 Km's of 4m wide Greenway along an existing road, and 0.5kms of 6m wide Greenway parallel to an existing Quay Flood Wall.
2. Construction of 2 x 4m wide Board Walk structures approximately 150m each in length.
3. Boundary treatment comprising a combination of RC retaining walls, 'perma crib' type walls, stone faced walls and earth embankments.
4. Traffic signal and lane alterations works at the Rice Bridge / Bridge st Junction.
5. Improvements to Public Lighting.
6. Utility diversions (ESB, GNI, Water, Foul and Surface Water, Telecoms, and under grounding of O/H's)
7. Road drainage improvements.
8. Road realignment, reinstatement and lining.
9. Paving works including exposed aggregate, limestone/granite slabs/blocks/setts.
10. All other associated ancillary works such as service ducts, road signs, .and way-finding signage.