II.1)
[QuantityScopeContract]
New school for St. Mary's Special Needs School, Extensions and alterations to Colaiste na Mi, refurbishment of existing protected structures and all ancillary site works.
[Fileref]:
Johnstown Education Campus
[Works]
Construction of Phase 2 of the Johnstown Education Campus within the curtilage of Sion House, which is a protected structure. The development will consist of part 3 storey, part 2 storey extensions to Colaiste na Mi (floor area of 5,385m2) linking the existing school building to Sion House & St Martha's college; alterations and refurbishment of Sion House & St Martha's College to accommodate Colaiste na Mi (Floor Area 2237m2) ; the construction of a split level part single storey, part 2 storey new school building for St. Mary’s Special Needs School (Floor Area 3,772m2) and all associated site works, including revised internal campus road layout, additional car parking; ballcourts; playing field; drop off areas and decanting of existing. This project is located on a live school campus. The project will be completed and handed over on a phased basis.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 23100000.00
EUR
[DivisionLots]:
[No]
II.2.3)
[PlacePerformance]
[MainsiteplaceWorksDelivery]:
Johnstown Education Campus, Navan, Co. Meath
II.2.4)
[DescrProcurement]
Construction of Phase 2 of the Johnstown Education Campus in Johnstown, Navan, Co. Meath, within the curtilage of Sion House, which is a protected structure. The development will consist of part 3 storey, part 2 storey extensions to Colaiste na Mi (floor area of 5,385m2) linking the existing school building to Sion House & St Martha's college; alterations and refurbishment of Sion House & St Martha's College to accommodate Colaiste na Mi (Floor Area 2237m2) ; the construction of a split level part single storey, part 2 storey new school building for St. Mary’s Special Needs School (Floor Area 3,772m2) and all associated site works, including revised internal campus road layout, additional car parking; ballcourts; playing field; drop off areas and decanting of existing. This project is located on a live school campus which includes Phase 1 of Colaiste na Mi (including extensive temporary accommodation) and St Stephen's National School. The project will be completed and handed over on a phased basis. The following specialist works will be undertaken on site by reserved specialists that are to be appointed by the Main Contractor:
- Mechanical Building Services
- Electrical Building Services
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 23100000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
24
[RenewalsSubject]:
[No]
[EnvisagedNumber]:
8
[CriteriaChoosingLimited]:
As Suitability Assessment Questionnaire
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
The following specialist works will be undertaken on site by reserved specialists that are to be appointed by the Main Contractor:
- Mechanical Building Services
- Electrical Building Services