II.1)
Scope of the procurement
Building Services (M&E) Engineering Services for Additional Accommodation at CBS, Mitchelstown
Reference number:
62420V
71334000
-
Mechanical and electrical engineering services
Services
II.1.4)
Short description
Building Services (M&E) Engineering Services for Additional Accommodation at CBS, Mitchelstown, Co Cork. CBS Mitchelstown is a voluntary secondary school under the trusteeship of The Edmund Rice Schools Trust.
Please see attached Project Brief & Schedule of Additional Accommodation
In summary, the project will comprise:
Section A:
• 1 x Technologies Prep Room 58.6 m2 each
• 1 x DCG room 88.6m2
• Student & staff toilets 8 m2
• Locker Space 72 m2
Giving a floor area incl circulation and internal walls of: 201 m2
Section B
• 3 Classroom SEN Base 507 m2
• Giving a floor area (incl circulation and internal walls of 649.7m2
Giving a Gross Floor Area for Section A & B (including circulation, internal walls & stairs 951 m2
Also:
• Secure Hard and soft play area 200 m2
• Sensory Garden 100 m2
• 9 parking spaces
Also:
• Demolition of Existing Prefab 100 m2
II.1.5)
Estimated total value
Value excluding VAT: 2070000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
71300000
-
Engineering services
71310000
-
Consultative engineering and construction services
71314310
-
Heating engineering services for buildings
71333000
-
Mechanical engineering services
II.2.3)
Place of performance
Main site or place of performance:
Co Cork, Ireland
II.2.4)
Description of the procurement
Building Services (M&E) Engineering Services for Additional Accommodation at CBS, Mitchelstown, Co Cork. CBS Mitchelstown is a voluntary secondary school under the trusteeship of The Edmund Rice Schools Trust.
Please see attached Project Brief & Schedule of Additional Accommodation
In summary, the project will comprise:
Section A:
• 1 x Technologies Prep Room 58.6 m2 each
• 1 x DCG room 88.6m2
• Student & staff toilets 8 m2
• Locker Space 72 m2
Giving a floor area incl circulation and internal walls of: 201 m2
Section B
• 3 Classroom SEN Base 507 m2
• Giving a floor area (incl circulation and internal walls of 649.7m2
Giving a Gross Floor Area for Section A & B (including circulation, internal walls & stairs 951 m2
Also:
• Secure Hard and soft play area 200 m2
• Sensory Garden 100 m2
• 9 parking spaces
Also:
• Demolition of Existing Prefab 100 m2
INTERIM TEMPORARY ACCOMMODATION
• Please note: Once appointed, the Design Team (DT) will be tasked with the provision of interim temporary accommodation (100 m2), including all required statutory approvals and compliances, to be used by the school until such time that the permanent structure has been completed. The DT are to ensure that the location of the interim temporary accommodation does not impede the development of the permanent additional accommodation.
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 2070000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
56
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no