II.1)
[QuantityScopeContract]
Removal of existing concrete tiles and replacing with new slated roof at Carrowkennedy NS
[Fileref]:
Carrowkennedy National School
[Works]
The works will entail the removal of the existing flat concrete tiled roof covering to include battens and roofing felt and disposal of same. The instillation of a new slated roof covering of circa 675m² on battens and counter battens on breathable felt underlay onto existing duo pitch roof truss @ 600mm c/c, 30° roof pitch.
Works will also entail new fascia, soffit, guttering, eaves and ridge ventilation, remedial works to chimney of boiler house, velux bulkheads and damaged ceilings internally in the building. Installation of new attic insulation and painting / decoration of internal classroom ceiling and walls.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 130.00
EUR
[DivisionLots]:
[No]
45400000
-
45450000
-
45454000
-
II.2.3)
[PlacePerformance]
[MainsiteplaceWorksDelivery]:
Westport, Co Mayo
II.2.4)
[DescrProcurement]
The works will entail the removal of the existing flat concrete tiled roof covering to include battens and roofing felt and disposal of same. The instillation of a new slated roof covering of circa 675m² on battens and counter battens on breathable felt underlay onto existing duo pitch roof truss @ 600mm c/c, 30° roof pitch.
Works will also entail new fascia, soffit, guttering, eaves and ridge ventilation, remedial works to chimney of boiler house, velux bulkheads and damaged ceilings internally in the building. Installation of new attic insulation and painting / decoration of internal classroom ceiling and walls.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 130000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[Indays]:
40
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
The contract will not necessary be awarded on the basis of the lowest price as time frame to carry out the work will also be taken into account as well as the capacity of the contractor to carry out the works within the timeframe.