Cashen Estuary Drainage Project - Site Investigation
A site investigation survey is required along the area of proposed works in order to provide information for the detailed design of the new electric/wind pumping stations and culverts in each individual polder as well as the upgrade of the existing sluices and the design of any other ancillary civil work such as new access tracks ,new electric power supply cable routes , chambers, kiosks etc. The site investigation location is set out in drawings included in the tender documents.
[LowestOffer]:
104602.10
EUR
/
[HighestOffer]:
326573.00
EUR
[TakenConsideration]
([ExclVat])