II.1)
Scope of the procurement
Civil Structural Engineering Services for Additional Accommodation at Mercy Secondary School, Ballymahon
Reference number:
63710M
71318000
-
Advisory and consultative engineering services
Services
II.1.4)
Short description
Civil Structural Engineering Services for Additional Accommodation at Mercy Secondary School, Ballymahon, Co Longford. Mercy Secondary School is a Catholic voluntary secondary school under the trusteeship of CEIST.
Please see attached Project Brief & Schedule of Additional Accommodation
In summary, the project will comprise:
SECTION A:
• 2 x General Classrooms 58.6 m2 each
• 1 x Science labs 88.6m2
• 1 x Prep Area 38.5m2
• 2 x SET Rooms 15 m2 each
• Student Toilets 22.5.m2
• Locker Space 25 m2
Total Floor Area 329 M2
Total Floor Area including circulation & internal partitions: 421 m2
SECTION B:
• 2 Classroom SEN Base 524.4 m2
Giving a Gross Floor Area SECTION A & SECTION B (including staircases, circulation and partitions of 1066 m2
and also external areas:
• Secure hard and soft play area 200 m2
• Sensory Garden 100m2
• 6 parking spaces
II.1.5)
Estimated total value
Value excluding VAT: 2430000.00
EUR
II.1.6)
Information about lots
This contract is divided into lots:
no
II.2.2)
Additional CPV code(s)
71300000
-
Engineering services
71310000
-
Consultative engineering and construction services
71311000
-
Civil engineering consultancy services
71311100
-
Civil engineering support services
71312000
-
Structural engineering consultancy services
71320000
-
Engineering design services
II.2.3)
Place of performance
Main site or place of performance:
Ballymahon, Co Longford
II.2.4)
Description of the procurement
Civil Structural Engineering Services for Additional Accommodation at Mercy Secondary School, Ballymahon, Co Longford. Mercy Secondary School is a Catholic voluntary secondary school under the trusteeship of CEIST.
Please see attached Project Brief & Schedule of Additional Accommodation
In summary, the project will comprise:
SECTION A:
• 2 x General Classrooms 58.6 m2 each
• 1 x Science labs 88.6m2
• 1 x Prep Area 38.5m2
• 2 x SET Rooms 15 m2 each
• Student Toilets 22.5.m2
• Locker Space 25 m2
Total Floor Area 329 M2
Total Floor Area including circulation & internal partitions: 421 m2
SECTION B:
• 2 Classroom SEN Base 524.4 m2
Giving a Gross Floor Area SECTION A & SECTION B (including staircases, circulation and partitions of 1066 m2
and also external areas:
• Secure hard and soft play area 200 m2
• Sensory Garden 100m2
• 6 parking spaces
Price is not the only award criterion and all criteria are stated only in the procurement documents
Value excluding VAT: 2430000.00
EUR
II.2.7)
Duration of the contract, framework agreement or dynamic purchasing system
Duration in months:
56
This contract is subject to renewal:
no
II.2.10)
Information about variants
Variants will be accepted:
no
II.2.11)
Information about options
Options:
no
II.2.13)
Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
no