Contract award notice

Information

Published

Date of dispatch of this notice: 29/04/2020

External Reference: 2020-252280

TED Reference: 2020/S 086-204973

Contract award notice

[NoticeContractAward]

[NoticeContractAwardSub]

[Directive201424]

[Section1]: [Ca]

I.1)

[NameAddressContact]

Design Pro Ltd.
IE 6400612O
Rathkeale Industrial Estate
Rathkeale
Co Limerick V94 ESC
IE
[Contactpoint]: Karolina Mazurek
[AddressPhone]: +353 6963842
[AddressEmail]: accounts@designpro.ie
[Internets]:
I.4)

[CaType]

[OtherType]:  Private company engaged in EU funded research and development
I.5)

[Mainactivity]

[OtherActivity]:  Renewable Energy

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Fabrication of steel support shaft and hubs for vertical access turbine
[Fileref]:  DPR60 Turbine Fabrication Servic
II.1.2)

[CpvMain]

42900000  - 
II.1.3)

[TypeContract]

[Services]
II.1.4)

[DescrShort]

DesignPro requires the fabrication of 2 X shaft + hub assemblies to support its vertical access hydrokinetic turbine. The units to be built are large steel structures that require precision machining and subsequent precision assembly of these components by welding and bolting. There is a short fabrication time frame required to meet company deadlines. The units must be completed and ready for collection by mid - September 2019. The overall dimensions are 6 meters tall and 2.5 meters wide. The central shaft is a 270 mm steel heavy wall pipe that must be worked on a lathe. The maximum diameter to be worked is 625 mm.There are two steel hubs 2.5 M in diameter that must be precision machined. High strength welding is required during assembly.
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.1.7)

[ValueTotal]

[ValueExclVat]:  50000.00  EUR
II.2)

[Description]

II.2.2)

[CpvAdditional]

42900000  - 
II.2.3)

[PlacePerformance]

[MainsiteplaceWorksDelivery]:  
Company Offices Rathkeale, Co Limerick Ireland
II.2.4)

[DescrProcurement]

DesignPro requires the fabrication of 2 X shaft + hub assemblies to support its vertical access hydrokinetic turbine. The units to be built are large steel structures that require precision machining and subsequent precision assembly of these components by welding and bolting. There is a short fabrication time frame required to meet company deadlines. The units must be completed and ready for collection by mid - September 2019. The overall dimensions are 6 meters tall and 2.5 meters wide. The central shaft is a 270 mm steel heavy wall pipe that must be worked on a lathe. The maximum diameter to be worked is 625 mm.There are two steel hubs 2.5 M in diameter that must be precision machined. High strength welding is required during assembly.
II.2.5)

[AwardCriteria]

[AwardCriteriaBelow]
[AwardCriterionQuality]  -  [AwardCriterionName]:  Resondent Technical Capability  /  [Weighting]:  30
[AwardCriterionQuality]  -  [AwardCriterionName]:  Detail of Proposed Solution  /  [Weighting]:  10
[AwardCriterionQuality]  -  [AwardCriterionName]:  Timeframe  /  [Weighting]:  40
[AwardLowestCost]  -  [AwardCriterionName]:  most economically advantageous  /  [Weighting]:  20
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [Yes]
[EuProgrRef]: Horizon 2020 SME support programme

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeOpen]
IV.1.8)

[GpaInfo]

[GpaCovered] : [No]
IV.2)

[InfoAdmin]

IV.2.1)

[PubPrevious]

[NumberOj]: 2019/S 160-394566

[Section5]: [AwardOfContract]

[ContractNumber]: 1

[TitleContract]: Fabrication of steel support shaft and hubs for vertical access turbine

[AwardConfirm]: [Yes]
V.2)

[AwardOfContract]

V.2.1)

[DateAward]

31/03/2020
V.2.2)

[AwardOffersInfo]

[OffersReceived]:  1
[OffersReceivedElectronic]:  1
[AwardedGroup] :  [No]
V.2.3)

[AwardedToName]

D Copeland Engineering Ltd.
817 4771 10
Unit 2, Block 11, Nobel Road,
Dundee
DD2 4UH
UK
[AddressPhone]: +44 1382624642
[AddressEmail]: steve@dcopeland.co.uk

[AwardedSme] : [Yes]
V.2.4)

[ValueContractInfo] ([ExclVat])

[ValueEstimTotalContract]:  50000.00  EUR
[ValueTotalFinal]:  40212.00  EUR

[Section6]: [InfoComplement]

VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

DesignPro Renewables
Rathkeale Industrial Estate
Rathkeale
V94 E5CO
IE
[AddressPhone]: +353 06963842
[AddressEmail]: accounts@designpro.ie