II.1)
[QuantityScopeContract]
Docklands infrastructure : Monahan Road Extension
[Fileref]:
Docklands Infrastructure : Monahan road extension
[Services]
Cork City Council (the “Client”) wish to engage a suitably qualified and experienced Consultant Engineer Led Multi-Disciplinary Design Team for the design and delivery of the Docklands Infrastructure: Monahan Road Extension. The scope of work includes all Stages: (i) Preliminary, (ii) Design, (iii) Tender Action, Evaluation, Award, (iv) Construction and (v) Handover of Works. The study area is located in the South Docklands area of Cork City.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 5000000.00
EUR
[DivisionLots]:
[No]
71300000
-
71310000
-
71311200
-
71311300
-
71312000
-
71313000
-
71313400
-
71313440
-
71320000
-
71322000
-
71322100
-
71322500
-
71324000
-
71325000
-
71327000
-
71330000
-
71332000
-
71400000
-
71410000
-
71420000
-
71500000
-
71510000
-
71520000
-
71521000
-
71530000
-
71540000
-
71541000
-
II.2.3)
[PlacePerformance]
[MainsiteplaceWorksDelivery]:
Cork
II.2.4)
[DescrProcurement]
Cork City Council (the “Client”) wish to engage a suitably qualified and experienced Consultant Engineer Led Multi-Disciplinary Design Team for the design and delivery of the Docklands Infrastructure: Monahan Road Extension. The scope of work includes all Stages: (i) Preliminary, (ii) Design, (iii) Tender Action, Evaluation, Award, (iv) Construction and (v) Handover of Works. The study area is located in the South Docklands area of Cork City.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 550000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
52
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]