Single Point Technical Advisory Team (Architectural Led) and Clerk of Works Services for NUI Galway Student Accommodation Phase 2
[Fileref]:
NUIG/BUILD/1115/2019
This Project represents Phase 2 of a substantial initiative by NUI Galway to develop a commercially viable, modern, appealing and environmentally friendly 674 bed student accommodation on campus. The accommodation will be delivered on a phased basis with the first phase required for immediate fitout on 1st June 2021 to allow for adequate setup in advance of the start of the new semester in September 2021. The second phase will be required for immediate fitout on the 1st June 2022 to allow for adequate setup in advance of the new semester in September 2022.
The Single Point Technical Advisory Team will be responsible for ensuring compliance with the works requirements by the Design and Build Contractor via reviewable design data, samples and regular on site inspections of the works to identify and report on any non conforming products, materials and workmanship.
The SPTAT also includes for the provision of a full-time site based Clerk of Works.
[ValueExclVat]:
539755.00
EUR