[MainsiteplaceWorksDelivery]:
Dublin
The successful candidate should demonstrate experience and detailed knowledge of design, implementation and operation of Smart Metering, Smart Grid or equivalent major programmes; and have a track record of successful advisory and consultancy services across a range of separately delivered projects in the context of large programmes comparable to the SMART Metering Programme.
The scope of the Consultancy and Advisory role for which we intend to invite Expressions of Interest for will include but will not be limited to the requirements stated below. It is expected that the total indicative scale of resources for this role will be up to 25 Full-time subject matter experts over the Initial period of the framework.
The successful candidate shall deliver on each and all of the following areas:
• Assist in leading the Development of an ongoing ESB Networks Business Smart Metering Operating Model Architecture and in the creation of the ESBN AMI and Smart Grid Business and Technical Strategy.
• Provide advice on Advanced Metering Infrastructure (AMI) and Smart Grid Industry intelligence.
• Recommend, contribute, develop, advise and collaborate on the AMI and Smart Grid High Level Technical Solution Architecture and Design, including Utility WAN and in-home channels.
• Recommend and advise on Advanced Metering Infrastructure (AMI) and Smart Grid procurement.
The successful candidate shall recommend, contribute, collaborate, develop and advise in each and all of the following specific areas of AMI and Smart Grid:
• Solution strategy, design integration and assurance,
• AMI IT and OT Design,
• AMI Communications and Metering Design,
• AMI and Smart Grid Business and Technical Architecture,
• AMI and Smart Grid Data Reporting and Analytics,
• End-to-end AMI and Smart Grid integrated design specification,
• Interoperability approach,
• Specification creation,
• Data model development,
• IT and OT Security ,
• Data Architecture and Privacy,
• Review of functional and technical specifications and other documents,
• AMI Procurement,
• Change Management and Business Transformation,
• Other services as requested related to AMI and Smart Grid Programmes.
A more detailed list of the deliverables will be provided in the Request for Tender (RFT) document.
[EnvisagedNumber]:
5
[CriteriaChoosingLimited]:
Applicants will be assessed on the quality of their responses to the criteria and rules outlined in the qualification questionnaire and at least the top scoring 5 firms will be invited to tender, subject to that number qualifying.
[Options]:
[Yes]
[OptionsDescr]:
At the date of issuing this PQQ it is envisaged that the framework agreement will be for an initial period of 24 months with an option to extend (subject to external factors applicable to continuity of the ESB Network’s Smart Metering Project), at the Contracting Entity’s discretion, for further periods up to 24 months from the expiry of the initial period. The total framework agreement period will be for a maximum of four years. Contracts awarded under the framework agreement may extend beyond the term of the framework agreement.
Please refer to the individual instructions for submission
of
bids relevant to each tender issued via the system.