II.1)
[QuantityScopeContract]
Mechanical Sub-Contract Works, New Build Construction of a 25 Class Primary School with an 8 Class Special Needs Unit at Scoil Íosagáin, St Mary’s Road, Ardaravan, Buncrana, Co Donegal
[Fileref]:
19967D
[Works]
Mechanical Sub-Contract Works:
Demolition of existing Sacred Heart and St. Columba`s School buildings, relocation and removal of temporary buildings, construction of a new build 2-storey 25 classroom Primary School incorporating 8 classrooms for Special Needs. The new building of 6335m2 GFA shall be constructed in 2 sequential Phases with a third Phase for construction of 3 hard ball courts, car parking and associated siteworks)
Reserved Specialists for the Mechanical and Electrical Services Installations are being pre-selected and procured separately from the Main Contract and when procured will enter into contract with the Main Contractor.]
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 1222000.00
EUR
[DivisionLots]:
[No]
II.2.3)
[PlacePerformance]
[MainsiteplaceWorksDelivery]:
Scoil Íosagáin, St Mary’s Road, Ardaravan, Buncrana, Co Donegal
II.2.4)
[DescrProcurement]
Mechanical Sub-Contract Works:
Demolition of existing Sacred Heart and St. Columba`s School buildings, relocation and removal of temporary buildings, construction of a new build 2-storey 25 classroom Primary School incorporating 8 classrooms for Special Needs. The new building of 6335m2 GFA shall be constructed in 2 sequential Phases with a third Phase for construction of 3 hard ball courts, car parking and associated siteworks)
Reserved Specialists for the Mechanical and Electrical Services Installations are being pre-selected and procured separately from the Main Contract and when procured will enter into contract with the Main Contractor.]
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 1222000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
30
[RenewalsSubject]:
[No]
[EnvisagedNumber]:
8
[CriteriaChoosingLimited]:
as Suitability Assessment Questionnaire
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
Reserved Specialists are being pre-selected and procured separately from the Main Contract and when procured will enter into contract with the Main Contractor. Reserved Specialists will be required to execute a Collateral Warranty with the Employer.