II.1)
[QuantityScopeContract]
L.É. RÓISÍN Design of Galley Layout, Fit-out and Supply & Installation of Galley Equipment
[Fileref]:
CON/0062/2019
[Supplies]
Galley design to include most economical and user friendly layout in existing space, utilizing and installing all equipment, including supply of said equipment, but maintaining best value for money, cost effectiveness (in terms of the requirement of additional cabling, air supply, extraction ducting etc), and adhering to best practices in terms of fire safety (marine FSS Code) and HACCP regulations.
[DivisionLots]:
[No]
39141000
-
39221000
-
39310000
-
44523300
-
45244100
-
45453000
-
II.2.4)
[DescrProcurement]
Galley design to include most economical and user friendly layout in existing space, utilizing and installing all equipment, including supply of said equipment, but maintaining best value for money, cost effectiveness (in terms of the requirement of additional cabling, air supply, extraction ducting etc), and adhering to best practices in terms of fire safety (marine FSS Code) and HACCP regulations.
[AwardCriteriaBelow]
[AwardCriterionQuality]
-
[AwardCriterionName]:
Quality Assurance
/
[Weighting]:
10%
[AwardCriterionQuality]
-
[AwardCriterionName]:
Design and Layout
/
[Weighting]:
25%
[AwardCriterionQuality]
-
[AwardCriterionName]:
Methodology for Delivery
/
[Weighting]:
20%
[AwardCriterionQuality]
-
[AwardCriterionName]:
Project Plan
/
[Weighting]:
15%
[Price]
-
[Weighting]:
30%
[Options]:
[No]
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
All works must be carried out, including the commissioning of equipment by 15 May 2020. It is expected that works will commence during the week beginning 9 March 2020.