Contract notice

Information

Published

Date of dispatch of this notice: 26/02/2020

Expire date: 17/04/2020

External Reference: 2020-214178

TED Reference: 2020/S 042-099485

Contract notice

[NoticeContract]

[Directive201424]

[Section1]: [Ca]

I.1)

[NameAddressContact]

Tipperary County Council
3259712MH
Civic Offices
Clonmel
Co.Tipperary
IE
[Contactpoint]: Gillian Flynn
[AddressPhone]: +353 0761065471
[Internets]:
I.3)

[InfoTendering]

[AddressObtainDocs]:  
http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=163166&B=ETENDERS_SIMPLE
[AddressFurtherinfo]
[AsContactsAbove]:  
[AddressSendTendersRequest]
[AddressSendTendersRequest]
[AddressToAbove]
I.4)

[CaType]

[MaintypeLocalauth]
I.5)

[Mainactivity]

[MainactivGeneral]

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

Consultancy Services for Suir Island Infrastructure Links
[Fileref]:  TCC00820E
II.1.2)

[CpvMain]

71322300  - 
II.1.3)

[TypeContract]

[Services]
II.1.4)

[DescrShort]

Tipperary County Council require the services of a multi disciplinary design team to design enhanced pedestrian and cyclist links from the Suir Blueway at the Gas house bridge to the town centre and Suir Island. The proposed infrastructure includes:
(e) Two bridges over the River Suir measuring 56m and 46m in length connecting Suir Island to the Quay and Raheen Road
(f) A boardwalk approximately 154m in length to connect the Island amenity area, the bridges referenced above and the car park
(g) Improved footpath widths and shared areas to connect the existing Blueway to the Island and town centre.
(h) The infrastructure and spaces should be inviting, beautiful and functional.
(i) The Consultant shall be required to carry out all the activities required of the Designer and Project Supervisor for the Design Process (PSDP) for the scheme.
II.1.5)

[ValueMagnitudeEstimatedTotal]

[ValueExclVat]: 200000.00  EUR
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.2)

[Description]

II.2.2)

[CpvAdditional]

71200000  - 
71300000  - 
71320000  - 
71322000  - 
II.2.3)

[PlacePerformance]

[MainsiteplaceWorksDelivery]:  
Clonmel
II.2.4)

[DescrProcurement]

Tipperary County Council require the services of a multi disciplinary design team to design enhanced pedestrian and cyclist links from the Suir Blueway at the Gas house bridge to the town centre and Suir Island. The proposed infrastructure includes:
(e) Two bridges over the River Suir measuring 56m and 46m in length connecting Suir Island to the Quay and Raheen Road
(f) A boardwalk approximately 154m in length to connect the Island amenity area, the bridges referenced above and the car park
(g) Improved footpath widths and shared areas to connect the existing Blueway to the Island and town centre.
(h) The infrastructure and spaces should be inviting, beautiful and functional.
(i) The Consultant shall be required to carry out all the activities required of the Designer and Project Supervisor for the Design Process (PSDP) for the scheme. The services to be provided will typically include development of the conceptual design and taking the designs through the Planning Process. Details of the services to be provided by Consultants are described in the tender documents.
For further information regarding the project please refer to the Brief
II.2.5)

[AwardCriteria]

[AwardCriteriaBelow]
[AwardCriterionQuality]  -  [AwardCriterionName]:  Experience  /  [Weighting]:  300
[AwardCriterionQuality]  -  [AwardCriterionName]:  Programme  /  [Weighting]:  200
[AwardCriterionQuality]  -  [AwardCriterionName]:  Resources  /  [Weighting]:  200
[AwardLowestCost]  -  [AwardCriterionName]:  Price  /  [Weighting]:  300
II.2.6)

[ValueMagnitudeEstimated]

[ValueExclVat]: 200000.00  EUR
II.2.7)

[DurationContractFrameworkDps]

[DurationMonths]: 9
[RenewalsSubject]: [No]
II.2.10)

[VariantsInfo]

[VariantsAccepted]: [No]
II.2.11)

[OptionsInfo]

[Options]: [Yes]
[OptionsDescr]:
If additional funding becomes available the contracting authority may extend the contract.
The cost of the additional options are to be included in the pricing document on a separate sheet but will not form part of the price assessment. Contract options will be required if additional funding becomes available to continue with the design process and develop the detailed design , tender documents and contract management.
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]

[Section3]: [InfoLegal]

III.1)

[ConditionsParticip]

III.1.2)

[EconomicFinancialStanding]

[CriteriaSelectionDocs]
III.1.3)

[TechnicalCapacity]

[CriteriaSelectionDocs]
III.2)

[ConditionsContract]

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeOpen]
IV.1.8)

[GpaInfo]

[GpaCovered] : [No]
IV.2)

[InfoAdmin]

IV.2.2)

[LimitReceiptTendersReqPart]

[Date]:  30/03/2020
[Time]:  16:00
IV.2.4)

[LanguagesAllowed]

[Language_EN]
IV.2.6)

[MinTimeMaintain]

[DurationMonths] : 6  ([FromStatedDate])
IV.2.7)

[OpeningConditions]

[Date]:  30/03/2020
[Time]:  16:00
[OpeningPlace]:  
Clonmel Civic offices of Tipperary County Council
[OpeningAdditInfo]:  
On line opening procedure, with Corporate services

[Section6]: [InfoComplement]

VI.1)

[RecurrenceInfo]

[RecurrentProcurement]:  [No]
VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

High Court
Chief Registrar, The Four Courts
Dublin
7
IE
[AddressPhone]: +353 18886000

VI.4.2)

[MediationBody]

Engineers Ireland
Dublin
IE

VI.4.4)

[AppealsInfo]

Tipperary County Council
Clonmel
IE