II.1)
[QuantityScopeContract]
Waterford City- North Quays Project- SAQ for Main Contractor
[Fileref]:
Waterford North Quays- SAQ
[Works]
Scheme includes 210 m long steel pedestrian bridge over river in SAC, train station including platforms, 2 road and 2 pedestrian bridges over railway, 800 m of realignment of existing dual carriageway and 250 m of new dual carriageway road; all in city center location to provide access to strategic development zone on the North Quays of Waterford City.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 53000000.00
EUR
[DivisionLots]:
[No]
45213321
-
45221111
-
45221113
-
45221115
-
45233121
-
45233125
-
45233128
-
II.2.3)
[PlacePerformance]
[MainsiteplaceWorksDelivery]:
Waterford
II.2.4)
[DescrProcurement]
Scheme includes 210 m long steel pedestrian bridge over river in SAC, train station including platforms, 2 road and 2 pedestrian bridges over railway, 800 m of realignment of existing dual carriageway and 250 m of new dual carriageway road; all in city center location to provide access to strategic development zone on the North Quays of Waterford City.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 53000000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
24
[RenewalsSubject]:
[No]
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
As per requirements of RFQ or RFT