II.1)
[QuantityScopeContract]
ELECTRICAL INSTALLATION: Construction of a 600 pupil Post Primary School and Sports Hall at Cloonmore, Tralee
[Fileref]:
RN 70560K GAELCHOLAISTE CHAIRRAI
[Works]
ELECTRICAL INSTALLATION: The project comprises the construction of a 600 pupil Post primary school with connected Sports Hall and ESB sub station, 4no. ballcourts, new internal road with set-down for buses and cars and accessing 55 no. car parking spaces and associated ancillary landscaping and siteworks including reprofiling of material on site.
The total development area is circa 7159m2 plus 80m2 external store
New Vehicular and pedestrian entrance of proposed Ballymullen Clash Link Relief Road. New internal access Road for access to the East of St Brigid’s Community Centre. New boundary wall treatments generally.
II.1.5)
[ValueMagnitudeEstimatedTotal]
[ValueExclVat]: 2000000.00
EUR
[DivisionLots]:
[No]
II.2.3)
[PlacePerformance]
[MainsiteplaceWorksDelivery]:
Cloonmore, Tralee.Co Kerry
II.2.4)
[DescrProcurement]
ELECTRICAL INSTALLATION: Procurement of Reserved Specialist: The project comprises the construction of a 600 pupil Post primary school with connected Sports Hall and ESB sub station, 4no. ballcourts, new internal road with set-down for buses and cars and accessing 55 no. car parking spaces and associated ancillary landscaping and siteworks including reprofiling of material on site.
The total development area is circa 7159m2 plus 80m2 external store
New Vehicular and pedestrian entrance of proposed Ballymullen Clash Link Relief Road. New internal access Road for access to the East of St Brigid’s Community Centre. New boundary wall treatments generally.
The Reserved Specialists are being pre-selected and procured separately from the Main Contract and when procured will enter into contract with the Main Contractor.
[AwardCriteriaDescriptive]
II.2.6)
[ValueMagnitudeEstimated]
[ValueExclVat]: 2000000.00
EUR
II.2.7)
[DurationContractFrameworkDps]
[DurationMonths]:
17
[RenewalsSubject]:
[No]
[EnvisagedNumber]:
8
[CriteriaChoosingLimited]:
As Suitability Assessment Questionnaire
[VariantsAccepted]:
[No]
[Options]:
[No]
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
Reserved Specialists (2No Specialist, Mechanical and Electrical) are being pre-selected and procured separately from the Main Contract and when procured will enter into contract with the Main Contractor. Reserved Specialists will be required to execute a Collateral Warranty with the Employer