Contract award notice

Information

Published

Date of dispatch of this notice: 16/12/2019

External Reference: 2019-262431

TED Reference: 2019/S 244-600832

Contract award notice

[NoticeContractAward]

[NoticeContractAwardSub]

[Directive201424]

[Section1]: [Ca]

I.1)

[NameAddressContact]

Office of Public Works (OPW)
N/A
52 St. Stephen's Green
Dublin 2
D02 DR67
IE
[Contactpoint]: Claire McKevett
[AddressPhone]: +353 16476765
[AddressEmail]: ncsc-nch@opw.ie
[Internets]:
[UrlGeneral]: http://www.opw.ie

I.2)

[JointProcurement]

[JointProcurementCentral]
I.4)

[CaType]

[MaintypeMinistry]
I.5)

[Mainactivity]

[OtherActivity]:  Government Office with responsibility for State Property

[Section2]: [Object]

II.1)

[QuantityScopeContract]

II.1.1)

[TitleContract]

National Concert Hall Redevelopment Programme Quantity Surveying Services
[Fileref]:  NCH2019-QS
II.1.2)

[CpvMain]

71324000  - 
II.1.3)

[TypeContract]

[Services]
II.1.4)

[DescrShort]

The National Concert Hall (NCH), as part of the Earlsfort Terrace Cultural Quarter development, will consist of a 3 phased development involving major refurbishment of the complex. Phase 1 involves enabling works including works to Pathology Building, provision of temporary boilers, statutory approval for demolition of Anatomy building, rationalisation of Butler Wings, relocation of NCH Restaurant and Call Centre. Phase 2 involves refurbishment, upgrade and extension to existing 1865 block, including auditorium extension, new orchestra rehearsal space and backstage facilities. Phase 3 involves design of 500 seater recital space.
Phase 1 works also include development of a National Children’s Science Centre involving refurbishment and restoration of existing north and part of east wing of NCH building and Real Tennis building, construction of new 4 storey over basement extension with planetarium dome to west of existing NCH and basement link from Concert Hall to Real Tennis building
II.1.6)

[LotsInfo]

[DivisionLots]: [No]
II.1.7)

[ValueTotal]

[LowestOffer]:  493965.00  EUR / [HighestOffer]:  1104520.00  EUR   [TakenConsideration]  ([ExclVat])
II.2)

[Description]

II.2.2)

[CpvAdditional]

71324000  - 
II.2.3)

[PlacePerformance]

[MainsiteplaceWorksDelivery]:  
Dublin 2
II.2.4)

[DescrProcurement]

The National Concert Hall, as part of the Earlsfort Terrace Cultural Quarter development will consist of a three phased development. The works to the National Concert Hall (NCH) involves a major refurbishment of the complex which will be carried out on a phased basis. Phase I involves a series of enabling works involving works to the Pathology Building, provision of temporary boilers, statutory approval for the demolition of the Anatomy building, rationalisation of the Butler Wings, relocation of the NCH Restaurant and Call Centre. Phase 2 involves the refurbishment, upgrade and extension to the existing 1865 block, which includes extending the auditorium along with a new rehearsal space for the National Symphony Orchestra and all backstage facilities. Phase 3 involves the design of a 500 seater recital performance space. The Phase 1 works also includes the development of a new National Children’s Science Centre. This project involves the refurbishment and restoration of the existing north and part of the east wing of the NCH building and the Real Tennis building. The construction of new four storey over basement extension with a planetarium dome to the west of the existing NCH and a basement link from the Concert Hall to the Real Tennis building.
II.2.5)

[AwardCriteria]

[AwardCriteriaBelow]
[AwardCriterionQuality]  -  [AwardCriterionName]:  Quality Criteria listed in the ITT  /  [Weighting]:  80%
[Price]  -  [Weighting]:  20%
II.2.11)

[OptionsInfo]

[Options]: [No]
II.2.13)

[EuProgrInfo]

[EuProgrRelated]: [No]

[Section4]: [Procedure]

IV.1)

[Description]

IV.1.1)

[TypeProcedure]

[ProctypeOpen]
IV.1.8)

[GpaInfo]

[GpaCovered] : [Yes]
IV.2)

[InfoAdmin]

IV.2.1)

[PubPrevious]

[NumberOj]: 2019/S 028-062735

[Section5]: [AwardOfContract]

[ContractNumber]: 1

[TitleContract]: National Concert Hall Redevelopment Project - Quantity Surveying Consultancy Services

[AwardConfirm]: [Yes]
V.2)

[AwardOfContract]

V.2.1)

[DateAward]

10/12/2019
V.2.2)

[AwardOffersInfo]

[OffersReceived]:  11
[NumberTendersSme]:  10
[NumberTendersMs]:  0
[NumberTendersNonms]:  0
[OffersReceivedElectronic]:  0
[AwardedGroup] :  [No]
V.2.3)

[AwardedToName]

W H Stephens
Sky Business Centre, Port Tunnel Business Park, Clonshaugh Industrial Estate
Dublin 17
IE

[AwardedSme] : [Yes]
V.2.4)

[ValueContractInfo] ([ExclVat])

[LowestOffer]:  493965.00  EUR / [HighestOffer]:  1104520.00  EUR   [TakenConsideration]

[Section6]: [InfoComplement]

VI.4)

[AppealsProcedure]

VI.4.1)

[AppealsBody]

The Commissioners of Public Works in Ireland
Office of Public Works
Dublin 2
D02 DR67
IE
[AddressPhone]: +353 16476000
[AddressEmail]: ncsc-nch@opw.ie
[Internet]: www.opw.ie