II.1)
[QuantityScopeContract]
Look – ahead Security Assessment Tool
[Fileref]:
ENQEIR658
[Services]
This tender process is now complete. Scope of Requirements is to use the models developed by EirGrid and functionality contained in the current WSAT tool or to develop a new software application. EirGrid envisages this project being a solution which will evolve over time and therefore intends awarding a contract with a potential maximum relationship of 20 years including options for renewal at various stages over the life of the arrangement.
[DivisionLots]:
[No]
II.1.7)
[ValueTotal]
( [HAgreeToPublish] [Yes] )
[ValueExclVat]:
5000000.00
EUR
72212517
-
72000000
-
72212700
-
72212781
-
72212983
-
72262000
-
II.2.3)
[PlacePerformance]
[MainsiteplaceWorksDelivery]:
Dublin and Belfast
II.2.4)
[DescrProcurement]
The Scope of Requirements is to use the models developed by EirGrid and functionality contained in the current WSAT tool or to develop a new software application to include, but not limited to:
The Look-ahead Security Assessment Tool will perform power system security analysis (steady-state and dynamic) across a time horizon from real-time up to (typically) 24 hours. The tool will suggest preventive measures in cases where the security criteria (to be defined in the detailed functional specification) is not met.
The tool will assess operational security components such as transient stability, voltage stability, frequency stability and thermal loading.
The tool output will facilitate system operations real-time decision making, displaying results in an appropriate manner to be detailed in the tender.
The tool will be based on RMS positive sequence calculations (steady-state load flow and time-domain dynamics). The time domain solver must include variable time step capability.
The tool will have on-line and off-line study capability.
The tool performance will be the equal, or better, to the existing WSAT tool as outlined in the Background section above.
The tool shall be operational in EirGrid’s Control Centres (Dublin and Belfast) by the end of 2019. The duration of the Delivery Contract will be up to project completion which will include for development, installation, testing, model validation, tool validation and integration of the tool in accordance with agreed programme. The Services Agreement will commence on the Services Commencement date and will be for an initial duration of three years with an option to extend.
II.2.5)
[AwardCriteria]
( [HAgreeToPublish] [Yes] )
[AwardCriteriaBelow]
[AwardCriterionQuality]
-
[AwardCriterionName]:
Resources
/
[Weighting]:
5%
[AwardCriterionQuality]
-
[AwardCriterionName]:
Project
/
[Weighting]:
15%
[AwardCriterionQuality]
-
[AwardCriterionName]:
Provision of Support
/
[Weighting]:
15%
[AwardCriterionQuality]
-
[AwardCriterionName]:
Requirements
/
[Weighting]:
40%
[AwardLowestCost]
-
[AwardCriterionName]:
Ultimate Cost
/
[Weighting]:
25%
[Options]:
[Yes]
[OptionsDescr]:
Under Article 50.F as set out in Council Directive 2014/25/EU as transposed into Irish law by the European Union Award of Contracts by Utility Undertakings) Regulations 2016 (S.I. 286 of 2016) (the “Regulations”) and given the complexity of EirGrid system set-up, the software installed may become embedded into EirGrid systems architecture. This may lead to future contracts for continuous support. Therefore EirGrid may award future contracts for continuous support up to the maximum allowed 20 years, subject always to the satisfactory performance of the supplier.
[EuProgrRelated]:
[No]
II.2.14)
[InfoAdditional]
The awarded value includes the possible extension of up to 20 years.